Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGElSAMPLING WORK SHEET . <br /> Project Name: v 4 Project Number: 7S <br /> to ISO <br /> Address: 55 ¢ Date: 3 Id D 3 <br /> OA Well Lack Number: �– <br /> Well Number. W L4 Well integrity: Mr_S •n c:- fl s i <br /> Develcpment(Purge/Sampler(s): Ambient Conditions: 5u n ri <br /> Pre-Purge 00 (mg/L) <br /> screened at WELL.VOLUME CALCULATION <br /> Weft casing Total Well Depth to Linear Feet Gallons Per <br /> Ota r n_ <br /> Depth ft Goundwater of GW linear Foot f Well valume l_ <br /> 0 Z <br /> XQ.17 r <br /> x 0.38 2 <br /> 4 — X 0.66 <br /> 4.5 _ = X 0.87 = <br /> 6 - = X 1.5 = <br /> GROUNDWATER SURFACE INSPECTION (SAILER CHECK) <br /> Floating Product(ft.)(in.): Sheen/iridescence: Odor. <br /> GROUNDWATER PURGING PURGE METHOD <br /> D Stainless Steel Sailer;❑Submersible Pump-NoAir Diaphragm Pump;❑Honda Pump;C2 Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Colorfrurbidity <br /> Purged (gal.) Time pH (Kslumhos) (°C) (other) <br /> 1 2--s- 0131 &-L— 77Z -zo •r EA2in 9 Recovery <br /> 2 _370 _O?31 (0.4 J 2a. NV U Rate: <br /> 3 _` _ b �•Q �� Za CCA2 Fast <br /> 4 Medium <br /> 5 Slow <br /> 6 <br /> 7 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level Recovery Sample Containers' <br /> ' Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially i'D. 2 t liter(L), amber glass <br /> (P) After Purging /7--0-0 40 ml VOA <br /> P -0.8 (P-l) = I.OZ 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling U Trip Blank <br /> (P-S)/(P-I) X 100 = Or- % Total Recovery <br /> Sample Date�Time: b•03 Turbidity (NTU): <br /> Calibrate DateiTime: EH (M EV): <br /> ' PURGED WATER CONTAINMENT <br /> Dotal drums at site: Water Sail Water pump through treatment system -~ <br /> ' Remarks: <br /> sl:es':xr.CE GAW.'riCW s.,��us•�++n:jw <br />