Laserfiche WebLink
i <br /> 12.5 feet to I foot bgs. The well MW-9 was secured at the surface with a flush-mounted, traffic-rated <br /> well box. Well construction details are presented in Figure 3. <br /> Soil cuttings from the borings and the wells were placed in three Department of Transportation (DOT) <br /> approved 55-gallons drums, and one 5-gallon bucket, and will be disposed of by Integrated <br /> Wastestream Management, Inc. (IWM) upon receipt of laboratory analytical results for total lead. <br /> ATC retained Morrow Surveying, a California-licensed surveyor, to survey the newly installed <br /> monitoring wells. Morrow Surveying visited the site on August 29, 2001 to determine the well head <br /> elevations relative to existing on-site and off-site wells. The survey data is presented in Appendix E. <br /> The wells will be developed and groundwater samples will be collected from the wells at the time of <br /> the next regularly scheduled quarterly groundwater-monitoring event for the site. <br /> ialn P•.ga..lOUIli.9T6P1Qti <br /> 9 <br /> URREPOR11111"'"S-11&nnC•.nJ Wdl In.eullamn,JK <br />