Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: ��� _/�� Project Numbe <br /> Address: 3 5 a Date: <br /> �- Well Lock Number, <br /> Well Number. IAJ- Weil Integrity: t3o <br /> Development/Purge/Sampler(s): M, ecRA2 Ambient Conditions' <br /> `e Pre-Purge DO (mg/(r..)..r U - <br /> Screened at WELL VOLUME CALCULATION <br /> i„ Weil Casing Total Well Depth to Linear Feet Gallons Per <br /> 01a in. rte thft. Go�ndwater G of GW Linear Foot 7 Well Vo1qmkLqa1j <br /> 9040 1i1712- W J'y x 0.17 <br /> x 0.38 - <br /> 4 - - x 0.66 <br /> 4.5 - = x 0.83 = <br /> 5 = x 1.5 = <br /> +r GR UNDWATER SURFACE INSPECTION BAILER CHECK) <br /> Floating Product(ft.) (in.): 14611 if Sheen/Iridescence: Odor: <br /> GROUNDWATER PURGING E,!Ofj <br /> M <br /> Stainless Steel Bailer, -Submersible Pump; Air Diaphragm Pump; Honda Pump; Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH (pslumhos) (°C) (other) <br /> 0 flLb '). T7 ►� <br /> $� C <br /> ZFa <br /> covery <br /> a a iL e <br /> ate: <br /> 3 -A --- r° _ $ . _as9 <br /> 4 <br /> I-P 5 Slow <br /> 6 <br /> 7 <br /> 9 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level Recovea Sample Containers <br /> Depth to GW(ft.) No. Preservation Method/pH <br /> (i) Initially t L;aa_ liter(L), an-Iber glass <br /> (P) After Purging 40 ml VOA 4 YdC <br /> P-0.8 (P-I) = 80% Recovery 500 ml polypropylene _ <br /> (S) Before Sampling Trip Blank !— _ <br /> (P-S)/(P-l)X 100 %Total Recovery -- <br /> +v <br /> Sample t7atelTime: • 0. 0 Y 15 .iS Turbidity (NTU): IJ <br /> Calibrate Date/Time, Q-,0.O Yt d$s(� _ EH (MEV): <br /> PURGED WATER CONTAINMENT <br /> dotal drums at site: Water _ Soil�_ Water pump through treatment system <br /> Lo Remarks. <br /> IVIeUamankhaiedZUBSUAFACE REhiEDIA'rlON+ DMIN RjBSLR.F.ACE 6ROUP4W SamplinVPwit2 doc <br />