Laserfiche WebLink
GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: I Project Number: 'T5.fo2 53.3205 - <br />�'' Address: Date: 330.0q <br /> ,57'6C J2A _ Well Lock Number: <br /> Well Number. MW-2- Well Integrity: C'-goon <br /> Development/Purge/Sampler(s): &(RW a _ Ambient Conditions: &-mnu _ <br /> Pre-Purge DO (itglL) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Dia er in. Depth ft. Goundwater Cs of GW Linear Foot 1 Well Volume al: <br /> Zq.toa = °L9I 1q.b9 x 0.sa j 3. 3'f <br /> 4 X 0.66 <br /> 4.5 - = X 0.83 — <br /> ' 1 6 - = X Z.5 = <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product(ft.) (in.): [*,kb1. Sheen/Iridescence: Odor: 5[1601- <br /> GROUNDWATER <br /> 6.0. 1- <br /> ' GROUNDWATER PURGING PURGE METHOD <br /> Stainless Steel Bailer, Submersible Pump; Air Diaphragm Pump; Honda Pump; Other <br /> ' Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH (pslumhos) (°C) (other) <br /> 0 0 to59 7.01 11114 Z4.0 C4enpl Recovery <br /> 1.. 3.S1100 -h9f- _414Lt 1.3.3 *� <br /> 2 '7.o 11101 ^_ (0.97 I/Y7 3,3 Rate: <br /> 3 10.5 000 6.95 //Y7 13. Fast <br /> 4 e lum <br /> 5 Slow <br /> 6 <br /> 8 <br /> 9 <br /> 90 <br /> GROUNDWATER SAMPLING Sampling Equipment: IEW _ <br /> Water Level Recovery Sample Containers <br /> ' Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially 17.11 9 liter(L), amber glass <br /> (P) After Purging 1510 40 ml VOA �_ HCL <br /> P-0.8 (P-1) = 1.0 80% Recovery 500 ml polypropylene <br /> rl (S) Before Sampling _aar Trip Blank <br /> (P-S)/(P-1) X 900 = _100 % Total Recovery <br /> ' Sample Date/Time: • 0.O T Turbidity (NTU): _ <br /> Calibrate ❑ateMme: 0-6EH (MEV). <br /> PURGED WATER CONTAINMENT <br /> i <br /> Total drums at site: Water ` Soil �_` Water pump through treatment system <br /> Remarks: <br /> r' NTleaaantonkshareMU135URFACE_REb1ED[AilQN4ADM[N SUBSURFACE CRQUP%GW Sampling•Purgeldue <br />