Laserfiche WebLink
I� GROUNDWATER MONITORING WELL PURGEISAMPLING WORK SHEET <br /> Project Name: QLjek iSkeA 0 I� Project Number: 75. 62503. 3205 <br /> Address: Date: Cl•100 3 <br /> Tt�c tc•�orl . C' 1 Well Lock Number: <br /> Well Number. w-S Well Integrity: _ <br /> Development/Purge/Sampler(s): Ambient Conditions: 1407— <br /> Pre-Purge <br /> 40 —Pre-Purge DO (mg1L) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Diable er flnJ Depth ft. Goundwater(GWI of GW Linear Foot 1 Well Volume al. <br /> 1S.2-o 10•9 _ 0.66 = 22 <br /> n X 0.17 <br /> -1 ?.? X 0.38 <br /> X �. <br /> 4 <br /> 4,5 - = X 0.83 = <br /> X 1.5 = <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product(ft.) (in.): QNOE: Sheen/Iridescence: Odor: <br /> GROUNDWATER PURGING PURGE METHOD <br /> Stainless Steel Sailer; Submersible Pump; Air Diaphragm Pump; Honda Pump; - Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> ' Purged (gal-) Time pH (pslumhos) (°C) (other) <br /> 0 01107 _ 40k— ZB. LCL Aft Recovery <br /> 1 1.0 __/to T (e.7 X035 zro. <br /> 2 Z•O t l 10 / fo-' /078• 24v•3 ate: <br /> 3 3.Q_ 11 1 l �o•? 1050 a <br /> ' 4 Medium <br /> 5 Slow <br /> 6 <br /> ' 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: E/1_ <br /> Water Level Recce Sample Containers <br /> ' Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially to.,39 1 liter(L), amber glass <br /> (P) After Purging /S-go 40 ml VOA <br /> P-0.8 (P-1) = SS 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling Trip Blank <br /> (P-S)/(P-1) X 100 = �W_%Total Recovery <br /> Sample Date/Time: q_11-0 :R 112.0 Turbidity (NTU): 1 <br /> Calibrate DateMme: q •0 EH (MEV): <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water ` Soil Water pump through treatment system <br /> Remarks: <br /> ' 1TlmantonitharedlSUHSURFACE REMEDIATIOMADMIN SUBSURFACE GROUP%rjW Santpling•PurgzZ doe <br />