Laserfiche WebLink
y. <br /> Project Name: QVIK ScP " i32, Project Number: 75. 1v25t''g. <br /> Address: _ z,-S L:gSZ AmM8 tJQ- S, ct T Date: 5-'Z <br /> -- Weil lock Number: <br /> Well Number _ Well Integrity: <br /> Development/Purge Sampier(s): __,L �02 -r-f _ Ambient Conditions: <br /> `b Pre-Pure DO (mg/L 1,SS <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing TOW Well Depth to !.!near Feet Gallons Per <br /> 0_.(ameter tin.}_ Qepth (Lt.) Gotindwater(GW of Gw Linear Fact_ 1 Weil Volume foal.] <br /> X 0.17 <br /> 3 Z�_'<>1 - q,G� - ZD.n 1 X 0.38 <br /> 4 = a X 0.66 Y <br /> 4.5 X 0.83 <br /> g _ _ X 1.5 <br /> GROUNDWATER SURFACE INSPECTION (SAILER CHECK) <br /> yam,' <br /> Floating Product (f.) (In.): Sheen/Iridescence: _ }-fit) Odor. <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, ❑ Submersible Pump;4 Air Diaphragm Pump; ❑ Honda Pump; ❑Other <br /> ' Stagnant Volume <br /> Volumes Purged Conductivity Temp. Colorfrurbidity <br /> Purged (gal.) Time pH (pslumhos) (°C) • (other) <br /> o t] lc. -7 ' Recovery <br /> 1 3.S ►c3i=._ �.V1 70� 2�.2 <br /> Rate: <br /> 2 �? J c37 L ,65 W 7-7-7,- <br /> 3 !c;,S _ �c3�, �Z � 2, t,� Fast <br /> Medium <br /> 5 Slow <br /> 6 <br /> 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level Recovery Sarnpje Containers <br /> De th to GW(ft.) No. Preservation Method/pH <br /> (1) initially e3 1 liter(L),.amber glass <br /> (P) Aber Purging 16.3r 40 ml VOA <br /> P - 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling •c3 Trip Blank <br /> (P-S) I(P-1) X 100 = r— % Total Recovery <br /> Sample DatelT;me: 5--'2,-Z-0 0` Turbidity (NTU): 7n•� <br /> Calibrate Date,/Time: 2z '`'( Q(,S� _ EH <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment system <br /> Remarks: <br /> E•.tiCti�:` z. <br />