Laserfiche WebLink
a <br /> Project Narne: V1 � cP 13.E . Project Number. 75 �7 t''5. O <br /> Address; _ �� .i ,arta ( cr Date: :5--Z <br /> Well Lock Number. <br /> Well Number. _ Well Integrity: <br /> DevelopmerrUPurge Samplers): Ambient Conditions: 5VLT77 <br /> Pre-purge DO (mg/L) <br /> ' Screened at WELL VOLUME CALCULATION <br /> ' Well Casing Total Well Depth to Linear Feet Gallons Per <br /> Diameter Onj Depth ft Goundwater fGMof GW Llnear Foot 1 ftiyoiumeJAa1J <br /> x 0.17 <br /> 3 Zb-s2 �a-, = jl ?s� X Q.38 <br /> 4 x 0.68 <br /> 4.5 - = x 0.83 = <br /> $ s x 9.5 <br /> GRO NDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): Sheen/iridescence: r•.b Odor: NU <br /> i <br /> GROUNDWATER PURGING PURGE METHOD <br /> i <br /> ❑ Stainless Steel Bailer, ❑ Submersible Pump;4Air Diaphragm Pump: ❑ Honda Pump; ❑Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Color/Turbidity <br /> Purged (gal.) Time pH (pslumhos) C) • (other) <br /> 0 4 3na 1.1 Recovery <br /> 2 �}' 02 5 Z3►73FaRate: <br /> 3 2 M <br /> 4 Medium <br /> 5 Slow <br /> 6 <br /> 7 <br /> 8 � <br /> s <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Level RecoverY Samole Containers <br /> De4th to GW(ft.) No. Preservation Method/pH <br /> (1) Initially 71 1 liter(L),.amber glass <br /> (P) After Purging D 40 ml VOA _ t PH G- <br /> P - 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling ;;LI Trip Blank <br /> (P-S) l (P-1) X 100 = (tom % Total Recovery ,'`` <br /> Sample Date/Time: �ZL��(/ - C3 Turbidity (NTU): G`1.0 <br /> f1 <br /> Calibrate Date.?ime: 61 OG—Sn EH (MEV): 7 <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment system <br /> Remarks: <br /> E'.+O,t1IvZNV IRG`"G'x'SuRpu i ?ug ix <br />