Laserfiche WebLink
M <br /> ON HE <br /> Eli -WINEP,570 <br /> TR q <br /> g <br /> The entire five-wall area and the VET'S will ba accurad Inuldo a <br /> 60-foot by 60-foot, S-fOOt high, barbed-wire topped chain-link <br /> fonca with acreanirig to reduce vialbillty from outaid(j. <br /> The !Iva well hoada will bra modified to Permit attachment of <br /> vapor extraction lines. A "T" will bo Plumbed to the well <br /> head, <br /> within the existing surface well cagIng, for the connection of <br /> the cobsurfaco extraction line an well ag d1loving accofin to the <br /> Individual well. Thic wall head modification 10 shown In Figure <br /> G. The vapor flow line from each wall will be buried about 12 <br /> Inches under ground to prevent Uv light deterioration of the pvC <br /> and keep this site from becoming too cluttered. <br /> AP part of the VETS Installation and startup, All City building <br /> and planning permits will be obtained before construction. Per- <br /> nits required by the City of Stockton Include a construction <br /> permit, a temporary Pole permit for electric hook-up, and an <br /> electric operation Permit. Permitting for the operation of the <br /> VETu with the San Joaquin County Air Pollution Control District <br /> (SJCAPCD) 13 also WOqUirod. This Permit, required by the city of <br /> Stockton before the city building permits are Issued, requites a <br /> detailed dascrlption and "ravings of the QQuipment used, the <br /> equipment location and operation, and oporating schedules, <br /> Slight modification of this work plan will suffice as a periTit <br /> application. Permitting of the Hasetech Mult1modo system will be <br /> aided by the fact that the SJCAPCD has permitted this syster, <br /> before at another site. <br /> In addition, this system has been per- <br /> mItted at several locations in Orange and San Diego counties, <br /> where air discharge regulations are extremely stringent. <br /> 3.3 TASK III SYSTEM STARTUP AND TESTING <br /> After the VETS in Installed, the system will be brought cn-line <br /> over a three-day period. This startup 14111 include the adjust- <br /> ment of the flown from the five wells, measurement og flow :tom <br /> each veil, and measurcment of contaminant concentrations from <br /> C52/91918/text <br /> 6 <br />