Laserfiche WebLink
3. SCOM:01:AOMMUNAL WORK <br /> EA and Oit-vton pm"sc that the pervious work plan,appruvcd part of clic perm;t to <br /> install six monitoring wails.be ammmicd to include the followini: <br /> 1. two additional mnitoring wclk installed on.sitc to m;;'Ol ixh the extent of <br /> cmw ri"at ion and ti'rtrtj line"of conwit]milon <br /> 2. two Additiamd monitoring wells installed offsite:ant in El Domdo Strut and one in <br /> HardingWay.monitoring webs MA7,MW5,and MW6 were installed cloc to the <br /> peri=w of the site,respecting a 10 foot sct.back from the si&wilks and sewer <br /> lints;this Icam little room on-site to establish a"zern line"ca!contamination on. <br /> site along the eastern and southern perirmicrs <br /> 3. rive vapor extraction wells installed around mniming wells MW3=1 NIW4 wtJ <br /> the forayer tank ficid.the wells will be completed-Aith tlae nccessari equipment to <br /> beumdasa functioning part ofapcxcndal vapor extraction mid treamwnt system <br /> (V M- ) <br /> 4. the soils sampled us the soil borings 3m(MIW;Ilm samples will be analyzed for <br /> petroleum h)*o,-xbcms at Pace Laboratories <br /> S. the:ncww-ells developed and ground waver in mh of the ten wcUs sarnplcd and <br /> analyzed at PAct Labomtorics <br /> 6. a final report including a pmpnsA for soil and ground-water rcmedW!on will be <br /> prepared according to the format proposed by Gordon Boggs of the Regional Water <br /> Quality ContmI Board,Central Valley Region. <br /> 4. TECHNICAL APPROACH <br /> 4.1 INSTALL AMONOFGROUNT>.NVATCRMONITOR14N*G WELLS <br /> EA propo=to Ins. Wouml_wA <br /> FiSwe 3. *Ibzc wells will be iuWkd to further assess tk extent of pcirolcunj <br />