My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012715
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0012715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:57:11 PM
Creation date
1/31/2020 2:43:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012715
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
655
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> BLAINE 1370 TULLY AD SUET[SD; <br /> SAN JOSC-� CA 9�12� <br /> TECH SERVICESINC, <br /> March 23, IDBR <br /> Chavron USA. Inc. <br /> 2 Annabel Lane, <br /> Shits 200 <br /> San Ramon. CA 94583 <br /> Attar, Ron n0fra <br /> SITE: <br /> C1117VRON SERVICE STATION No, 1916 <br /> 45 FAST ILOLFIDING WAY <br /> STOCKTON. CALIFORNIA <br /> PROJECT- <br /> FULL SERVICE STATION DEMOLITION <br /> WITH 11MMOVAL OF ALL ABOVE GROtjfjD <br /> AND SUBSURFACE INSTALLATIONS <br /> SA,J-.PLFD O.Lj: <br /> FEBRUARY 24, 1988 <br /> This report describes the Initial environmvntal ltamplint <br /> Performed bF our firm on this project. In addition and d*Culnentation <br /> text, itself, oupportins documents ar4a Provided 10 the Sampling Report <br /> Include the chain of custody and &I GtEnichments. That* <br /> All those documents should be kept together and Prenerved as a file of <br /> tha certified "Aly""I I-AbOrAtOrY report. <br /> Interrelated records which, together, comprise the documentatfon of the work <br /> performed at the site. It additional work in required, then & cumulative <br /> report format %.III be followed to that fjl Information on the v&rjous phases <br /> Of WO-rk at the site can be gszily reviewed. <br /> THR Scopg OF WORK <br /> tit orcxnct with Your request. field ptrzonnrl were &t'natched to the <br /> t* Obatrve the tank removal, collect XA=Pj0j1' site <br /> the Sampits and maintain adequatm document.3 arrAnge the pripir analysts of <br /> 114n resulting jr, the lazuence df <br /> r*M*I SADPlIng Report. The c <br /> ollectlon of 0nvjronM#AL4i tamplas was <br /> sampling Report SW55-C-2 CURV1W lots <br /> Palo I <br />
The URL can be used to link to this page
Your browser does not support the video tag.