Laserfiche WebLink
Eli <br /> V�x <br /> 1370 TULLY 11D.,SUITE 50 <br /> T-j17i.,_(_ BLAINE <br /> SAN JOSE, CA 05122 <br /> TECH SERVICES INC'. 05 553') <br /> Novembnr 14, 1114M <br /> Chevron USA, Inc. <br /> 2410 Camino Ramon <br /> Son Ramon, CA 94583 <br /> r <br /> Attn' Ron Reffa <br /> SITE: <br /> P.11p.vRON SERVICK STATION NO. 1910 <br /> 45 FA5T IIARDING WAY <br /> STOCKTON, CALIMR111A <br /> PROJFCT: <br /> FULL SPRVICH STATION =MOLITION <br /> WITH REMOVAL OF ALI, ADOVE GROUND <br /> AND SUBSURFACE INSTALLATIONS <br /> SAMPLED ON: <br /> NOVEMBER 1, 1988 <br /> T-1 <br /> Si'OCKPILE SAMPLING REPORT 88306-M-3 <br /> SUMMARY OF RECENT SAMPLING <br /> DATE "L]: f ACTIVI1`Y <br /> SLCTION ONE 2/24/88 88055-C-2 Tank removal sampling <br /> SECTION TWO 2/26/86 88057-C-1 Additional excavation <br /> 411-2 Stockpile stmpling <br /> SECTION THREE 10/6/88 88280 <br /> >SECTION FOUR :1/1188 8830641-3 Stockpile sampling <br /> This report is SECTION FOUR within the chronological CumulaUve Report which <br /> - <br /> contiilna <br /> all relevantavaterialir for-work--done on-Abi—ProJect [it V.* aubj"L <br /> S 'CTION FOUR/Pago <br /> Sampling Report M06-M-3 Chevron 1918 <br /> Sh <br /> T <br />