Laserfiche WebLink
- <br /> -.w� <br /> e. .'. ':�:b_. .A +r.:,`c x T" :a.� .. .- X54 m"�.,�„�;y _`rr,' �,s n?t mac•. '`�i'.Kx '�.�°Pa � -_:�-�'. :?a '3 fir- ,°'-� �- —�3 ,�, .�a,- •m�` �`"� - <br /> .� <br /> In addition to the field investigation,EA recommends collection of any information on athcr <br /> potential srwmts of petrrleum and previous haul use in the vicinity of the sits, <br /> Two of(site wells(Figure 2)arc also proposed to define the downgmdlcnt extent of the plume <br /> sheet may Bare nwved along a buried streartt channel indicated by earlier investig>Ilons, Placc. <br /> trtcnt of downgradicnt yells was based on output of the computer model BIOPLUME 11 (Rice <br /> Unlvcrsity 1987)wing data from the 15 Novemb” 1988 and 14 Aprd 1989 well gauging and <br /> umpling tcwnds(1-igurc 2). <br /> 4. STATV8 OF SOIL,AND GROUNDIVATI R REMEDIATION <br /> lletween 23 and 25 January 1989,rive vapor extraction wells were installed in and around the <br /> fomter undcrVound storage tank arca,to be used for mrrcdiadon ofpetrolcum hydrocarbons in <br /> soils. Shills were sampled during drilling and analyzed for petroleum hydrocubons. t onecrttra- <br /> tWit up to 16,O00 ppm TPH were found at 24.5 feet in wells V3 and V5. T1'll levels fou.-A at 31 <br /> X feet In MW4 were 3.300 ppm(see Table 3). <br /> On 24 April 1989,four of the five vapor cunction wells wcre tested to dctemrine design param- <br /> vers for a vapor extraction and treatment system at the site. The coaccntrations measured in <br /> vapor Rant*yells V2.V4.and V5 averaged 4,5CO3$0.000.and 16,000 ppm.respectively. Can <br /> the slate day,the vapor tmnsmissivhy of the soil was tested. <br /> The sail vapor h)*ocarbon concentrations and the soil vapor trartsmissivity nr mpirements indi- <br /> cate that the soils beneath former SS 9-1918 arc well suited to pet;olcum vapor extraction. <br /> Vspor extraction and treatment wilt be Initiated upon completion and installation of the system <br /> an site(29 Octol 1990). Grouadwster%;-tele MW3.MW4.MWS,and MW6,which are now <br /> dry will be plumbed to the system so that hydrocarbom stem ied in clays and ssr.ds by the de- <br /> cline of grvindw�tcr can be mmiedsated i'Figurr 3). <br /> Bocausc all wells on the:site are dry.EA has developed a work plan for further investigation <br /> prior to considering remedist;on of pp7outrdwatex. <br /> S. REFERENCES <br /> CA (EA f ngincering,Science, and Technology). 1990. Proposed Work Plan to Assess <br /> Gro�rndu�atcx Corrtaminadon,l"�nrr:�r t;.'heti�xrn SS 9.1918.Stocktbrs,t^..i, 4�larctt. <br /> t4*1 avgt 2 <br />