Laserfiche WebLink
H <br /> The entire five-well area ane. the VE:T5 will bo aocurod innida a <br /> 60-toot by 60-foot, G-foot high., Iuirbad-wira topped chain-link <br /> fence with screening to rtauco visibility from outoldo. <br /> Thu five well hands will be modifiad to permit nttachment of <br /> vapor extraction lined. A "T" will be plumbad to the well head, <br /> within the existing surfaco well caning, for than connection of <br /> the subsurface extraction line as wall &a allowing access to then <br /> Individual well. This well head modification it chovn in Figura <br /> G. Tho vapor flow line from each wall will be buried about 12 <br /> Inches under ground to prevent UV light deterioration of the PVC <br /> and koop the alto from becoming too cluttered. <br /> As part of the VETS installation and startup, all City building <br /> and planning permits will ba obtained before construction. Per- <br /> mits required by the City of Stockton includo a construction <br /> permit, a temporary polo permit for electric hook-up, and an <br /> electric operation permit. Permitting for the operation of the <br /> Vl:ra with the San Joaquin County Air Pollution Control Dlatrict <br /> (SJCAPCD) Is alto required. This permit, required by the City of <br /> Stockton before the city building permits are lanued, requires a <br /> detailed description and drawings of the equipment used. the <br /> equipment location and operation, and operating cchoduloo. <br /> Slight modificatien of this work plan will suffice an a permit <br /> application. Permitting of the 11aactach Multimodo system will be <br /> aided by the fact that the SJCAPCO has permitted this system <br /> before at another alto. In addition, this system has been per- <br /> mitted at several locations in Orange and San Diego counties, <br /> where air discharge regulations are extremely stringent. <br /> 3.3 TASK III SYSTEM STARTUP AND TESTING <br /> After the VETS Is installed, the system will bo brought on-line <br /> a-thra a-day_period This.-ctar t up--vi 11­1 ncl ud* <br /> ment of the flows from the five wells, measurement of flov from <br /> QA-.h well, andmeasuro*ent of contaminant concentrations from <br /> C52/91918/text <br />