My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012715
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0012715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:57:11 PM
Creation date
1/31/2020 2:43:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012715
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
655
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H <br /> The entire five-well area ane. the VE:T5 will bo aocurod innida a <br /> 60-toot by 60-foot, G-foot high., Iuirbad-wira topped chain-link <br /> fence with screening to rtauco visibility from outoldo. <br /> Thu five well hands will be modifiad to permit nttachment of <br /> vapor extraction lined. A "T" will be plumbad to the well head, <br /> within the existing surfaco well caning, for than connection of <br /> the subsurface extraction line as wall &a allowing access to then <br /> Individual well. This well head modification it chovn in Figura <br /> G. Tho vapor flow line from each wall will be buried about 12 <br /> Inches under ground to prevent UV light deterioration of the PVC <br /> and koop the alto from becoming too cluttered. <br /> As part of the VETS installation and startup, all City building <br /> and planning permits will ba obtained before construction. Per- <br /> mits required by the City of Stockton includo a construction <br /> permit, a temporary polo permit for electric hook-up, and an <br /> electric operation permit. Permitting for the operation of the <br /> Vl:ra with the San Joaquin County Air Pollution Control Dlatrict <br /> (SJCAPCD) Is alto required. This permit, required by the City of <br /> Stockton before the city building permits are lanued, requires a <br /> detailed description and drawings of the equipment used. the <br /> equipment location and operation, and operating cchoduloo. <br /> Slight modificatien of this work plan will suffice an a permit <br /> application. Permitting of the 11aactach Multimodo system will be <br /> aided by the fact that the SJCAPCO has permitted this system <br /> before at another alto. In addition, this system has been per- <br /> mitted at several locations in Orange and San Diego counties, <br /> where air discharge regulations are extremely stringent. <br /> 3.3 TASK III SYSTEM STARTUP AND TESTING <br /> After the VETS Is installed, the system will bo brought on-line <br /> a-thra a-day_period This.-ctar t up--vi 111 ncl ud* <br /> ment of the flows from the five wells, measurement of flov from <br /> QA-.h well, andmeasuro*ent of contaminant concentrations from <br /> C52/91918/text <br />
The URL can be used to link to this page
Your browser does not support the video tag.