My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012715
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0012715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:57:11 PM
Creation date
1/31/2020 2:43:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012715
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
655
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RARE= <br /> ru <br /> -MM <br /> g� <br /> EMT R tR <br /> w;,F RN R <br /> each wall, from tho five v*lln togothor, and from the VAT's <br /> dincharga, Uning VA's mobile 940 chromatcqraph. Vapor contam- <br /> inant conc&ntrAtiona v1ll ba recordod for each wall to parnit <br /> assecament, of the OffoCtivcnana of the 6yaten and they docay of <br /> contaminant concentrations over time. It is antIcipAtod that <br /> emission discharge sample analysis for airborne lead will be <br /> required by SJCAPCD. Such BOMP16n, an raqaired, will be col- <br /> lected and delivered to a certified laboratory for analytic. <br /> After the VETS is brought on lino, the systom will be monitored <br /> and sampled to dotermina the GYGtQn's effectiveness and overall <br /> efficiency. The prnpoued monitoring and sampling achodule in as <br /> follows tuchadule and sampling requirements oay be mod1fled by <br /> SJCAPCD requiramonta): <br /> Nook I daily monitoring with vapor sample collection <br /> and analysis (5 days) <br /> Weeka 2-4 systcm Adjustment and sample collection on <br /> Monday, Wednesday, and Friday <br /> Weeks 5-26 one day per week of system adjustment and <br /> CamPlO Collection. <br /> As part of the monitoring and sample schedule, total and indi- <br /> v1dual voll.discharges, Individual well and total discharge of <br /> contaminants to the VCP and CAR for treatment, and total emission <br /> concentrations from the VETS (expected to be zero) will be <br /> logged. <br /> 3.4 TASK IV <br /> SYSTEM OPERATION AND MAINTENANCE <br /> hs-Bart-of-tFto-vim operation lA`wi31 maintain <br /> and operate the <br /> vapor treatment equipment, the plumbing systom and all Isonitoring <br /> eqUipmant. Additionally, the logo of vapor flow rates. vapor <br /> 052/91918/text <br />
The URL can be used to link to this page
Your browser does not support the video tag.