Laserfiche WebLink
RARE= <br /> ru <br /> -MM <br /> g� <br /> EMT R tR <br /> w;,F RN R <br /> each wall, from tho five v*lln togothor, and from the VAT's <br /> dincharga, Uning VA's mobile 940 chromatcqraph. Vapor contam- <br /> inant conc&ntrAtiona v1ll ba recordod for each wall to parnit <br /> assecament, of the OffoCtivcnana of the 6yaten and they docay of <br /> contaminant concentrations over time. It is antIcipAtod that <br /> emission discharge sample analysis for airborne lead will be <br /> required by SJCAPCD. Such BOMP16n, an raqaired, will be col- <br /> lected and delivered to a certified laboratory for analytic. <br /> After the VETS is brought on lino, the systom will be monitored <br /> and sampled to dotermina the GYGtQn's effectiveness and overall <br /> efficiency. The prnpoued monitoring and sampling achodule in as <br /> follows tuchadule and sampling requirements oay be mod1fled by <br /> SJCAPCD requiramonta): <br /> Nook I daily monitoring with vapor sample collection <br /> and analysis (5 days) <br /> Weeka 2-4 systcm Adjustment and sample collection on <br /> Monday, Wednesday, and Friday <br /> Weeks 5-26 one day per week of system adjustment and <br /> CamPlO Collection. <br /> As part of the monitoring and sample schedule, total and indi- <br /> v1dual voll.discharges, Individual well and total discharge of <br /> contaminants to the VCP and CAR for treatment, and total emission <br /> concentrations from the VETS (expected to be zero) will be <br /> logged. <br /> 3.4 TASK IV <br /> SYSTEM OPERATION AND MAINTENANCE <br /> hs-Bart-of-tFto-vim operation lA`wi31 maintain <br /> and operate the <br /> vapor treatment equipment, the plumbing systom and all Isonitoring <br /> eqUipmant. Additionally, the logo of vapor flow rates. vapor <br /> 052/91918/text <br />