My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002658
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0002658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:06:46 PM
Creation date
1/31/2020 3:15:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002658
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 12, 1996 <br /> Page 13 <br /> garding <br /> �Ifyou have any questions re —the contentofthis-letter, please call <br /> Sincerely, <br /> ED Gto <br /> Pacifi nvironmentaroup, Inc. I., <br /> ROSS �v NTNUNE <br /> 4F. <br /> No. 5860 <br /> ' Ross Tinline rxp. I <br /> Project Geologist <br /> RG 5860 °F eW3 <br /> Attachments Table 1 - Off-Site Private and Municipal Well Data <br /> Table 2 - Soil Analytical Data- Total Petroleum Hydrocarbons <br /> - (TPPH as Gasoline, BTEX Compounds, Organic Lead, , <br /> Total Lead, PCBs, and Ethylene Dibromlde) <br /> Figure 1 - Site Location Map <br /> Figure 2 - Site Map <br /> Figure 3 - Site Map Before SVE System Operation (November 1990 - <br /> i� November 1992) <br /> Figure 4 - Geologic Cross-Section A-A'- Before SVE System <br /> i Operation (November 1990 - November 1992) <br /> Figure 5 - Geologic Cross-Section B-B'- Before SVE System <br /> Operation (November 1990 - November 1992) <br /> Figure 6'- Site Map After SVE System Operation (November 1990 - <br /> November 1992) <br /> Figure 7 - Geologic Cross-Section A-A'- After SVE System <br /> Operation (November 1990 -November 1992) <br /> Figure 8 - Geologic Cross-Section C-C'- After SVE System <br /> Operation (November 1990 -November 1992) <br /> Attachment A - SVE Operational Data and Mass Calculations of <br /> Hydrocarbons in Soil _ ' <br /> Attachment B - Fate and Transport Model - <br /> Attachment C - Groundwater Monitoring and SVE Well Logs <br /> Attachment D - Groundwater AnalyticalData <br /> Attachment E - Case Closure Checklist <br /> cc Mr Jeff Moore, Greenwood & Moore, Inc <br /> Mr Steye Pulcheon, Taco Bell Corporation <br /> Ms Elizabeth Thayer, Regional Water Quality Control Board - Central VaIIey <br /> Mr Bette Owen, Chevron Products Company - <br /> Mr'Brett Hunter, Chevron Products Company <br /> T , <br /> 3201337$1CLQSURE2 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.