Laserfiche WebLink
i <br /> ,I <br /> I <br /> i <br /> ®MW 14 <br /> ASPHALT <br /> CONCRETE <br /> EXISTING <br /> j BUILDING <br /> q OMW16 <br /> FORMER USED SB4 MW-8 MINA 1® MW 12 <br /> OIL'TANK <br /> (INSTALLED 1854) LEGENLU D <br /> ^ 7 SB 5 = MW 32 OGROUNDWATER MONITORING WELL LOCATION <br /> O SS4 Z AND DESIGNATION <br /> LU <br /> EXISTING 1`a SB-7 FORMER PRODUCT i a 1'� , V-1 A SOIL VAPOR EXTRACTION WELL LOCATION AND <br /> BUILDING ISLANDS ! Q DESIGNATION <br /> FORMER <br /> STATION MW 3 - Q MVP 20 DESTROYED WELL LOCATION AND DESIGNATION <br /> BUILDING V-4A�rSB•13 0 <br /> --- <br /> ® <br /> X35 SSB 1a 'S Mw 13® Q S&5 0 SOIL BORING LOCATION AND DESIGNATION <br /> t S A V-5 O SR-10 xSOIL BORING LOCATION AND DESIGNATION <br /> SB-12 � S&1 _ (LOCATION APPROXIMATE) <br /> Mw 1® V-1 `rs SB-11 + mw-5 O <br /> J X25—TPH-g a10 ppm AT DEPTH INDICATED IN FEET <br /> FORMER UNDERGROUND + W <br /> I______ I S&9 <br /> FUEL STORAGE TANK V-2 A MW 2RO I-#-� <br /> COMPLEX(INSTALLED 1984) --I,- <br /> 0 MW 2 <br /> I' FORMER PRODUCT <br /> `ISLAND <br /> _ NOTE <br /> EAST HQRDING WQy 1 UNDERGROUND STORAGE TANKS LOCATED <br /> DURING FIELD WORK 11!88 and 12193 <br /> 2. UNDERGROUND STORAGE TANKS ON HISTORIC <br /> FACILITY PLANS <br /> FORMER CHEVRON SERVICE STATION u <br /> PACIFIC SCALE e <br /> ENVIRONMENTAL 45 East Harding Way at EI Dorado Avenue FIGURE <br /> GROUP INC0 � Stockton Calitomla 3 <br /> SITE MRP BEFORE SVE SYSTEM OPERATION(NOVEMBER 199E1-NOVEMBER 1992) PROJECT <br /> 320.133 713 <br /> II <br />