Laserfiche WebLink
SOIL AND GROUND WATER REMEDIATION QUESTIONNAIRE <br /> Facl1ity Name Chevron U. S.A. Service Station 9-1918 <br /> 45 Harding Way at E1 Dorado Avenue <br /> Site Address: <br /> Project Managing Company: Pacific Environmental Group, Inc. <br /> Address- 2025 Gateway Place Suite 440 San Jose California 95110 <br /> ContactName•Bill Clemons Phone: (408) 441-7500x222 <br /> Issue Permit To: Chevron U. S.A. <br /> Mwhug Address: P.O. Box 5004 San Ramon, California 94583 <br /> ;. Source Of Hydrocarbon Contamination(Include Substance And Source): <br /> 40asoline From Former Storage Tanks and Lines. <br /> i_ Affected Media: X Soil <br /> X Ground Water <br /> i. Hydrocarbon Concentration Of The Soil At Tho Most Contaminated Locator(PPM): <br /> Xylenes : 67 <br /> TPH-gasoline: 2000 Benzene- It. 0. 25 Toluene : It. 0. 25 Ethylbenzene : _ 3.5_ <br /> T. Hydrocarbon Concentration Of The Ground Water At The Most Contaminated Location (PPM): <br /> Xylenes : It. 0. 5 <br /> TPH-gasoline* 240 Benzene: 2. 3 Ethylbenzene : 0. 5 Toluene: it. 0. 5 <br /> L Maximum Hydrocarbon Concentration Of The Air Stream Entering The Control Equipment From The Sort Wells (PPM): <br /> TPH gasoline : 6500 - <br /> a. Maximum Hydrocarbon Concentration Of The Air Stream Entering The Control Equipment From the Air Stripper(PPM): <br /> N/A <br /> 10. Maximum Air Flaw Into The Control Equipment From The Soil Wells (CFM): <br /> 108 CFM <br /> is <br /> U. Maximum Air Flow Into The Control Equipment From.The Air Stripper(CFM): <br /> N/A <br /> M Maximum Water Flow Into The Air stripper(GPM): <br /> N/A <br />