My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002666
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
ARCHIVED REPORTS_XR0002666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 4:44:15 PM
Creation date
1/31/2020 3:28:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002666
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-: -Backfill (3,000 cubic yards at $45/cubic yard)- - - $135,000 ----- - <br /> • Disposal Fees(3,000 cubic yards at $40/cubic yard) $120,000 <br /> • Analytical Fees (65 samples at $115/sample) $7,500 <br /> • Site Management (Soil Sampling, Regulatory <br /> Liaison, Permitting, and Reporting Fees) $35,000 <br /> Capital Subtotal $467,500 <br /> Air Sparge <br /> • System Design and Remediation $15,000 <br /> Permitting <br /> • System Construction, Installation, $40,000 <br /> and Permitting <br /> • Well Installation (3 Sparge Wells) $10,000 <br /> • Capital Equipment $50,000 <br /> • Project Status Reporting $3,000 <br /> During Implementation <br /> Capital Subtotal $118,000 <br /> Annual Costs <br /> • Groundwater Monitoring $4,100/year <br /> (8 year life) <br /> • Operation and Maintenance <br /> Year 1 $45,000 <br /> Years 2 and 3 $10,000/year <br /> • Utility Costs <br /> Year 1 $30,000 <br /> Years 2 and 3 $5,000/year <br /> . 3201337B1CAP_AMD DOC D - 2 November 30, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.