Laserfiche WebLink
1' <br /> I <br /> I� <br /> I <br /> •MW 14 <br /> I <br /> ASPHALT <br /> I�) CONCRETE <br /> EXISTING <br /> BUILDING <br /> MW-10 - <br /> � SB-4 MW 11• MW-12 • <br /> FORMER USED MW-8 <br /> OIL TANK LEGEND <br /> (INSTALLED 1984) _ LU MW 12 <br /> GROUNDWATER MONITORING WELL LOCATION <br /> 1 tijyy 7 SB 5 M AND DESIGNATION <br /> 0 sa-s Z <br /> LLJ V-1A SOIL VAPOR EXTRACTION WELL LOCATION AND <br /> rZ &7 `�`1 <br /> � EXISTING FORISLANDS <br /> PRODUCT > DESIGNATION <br /> �\ 1 �� <br /> BUILDING ISLANDS ` <br /> FORMER MW-3• ' 0 Mw 20 DESTROYED WELL LOCATION AND DESIGNATION <br /> STATIONBUILDING V-4 —5813 • SB-5 0 SOIL BORING LOCATION AND DESIGNATION <br /> --- 25— � mw' 13 Q <br /> I 35 MWS x5&10 SB-10 SOIL BORING LOCATION AND DESIGNATION <br /> sA V S O (LOCATION APPROXIMATE) <br /> II SB 12 3 SEW <br /> mwi* V 4 "TS SB 11 FT-1 0 Mw_5 � X25—TPH-g>1Oppm AT DEPTH INDICATED IN FEET <br /> I LU <br /> �., <br /> FORMER UNDERGROUND " I S&9 <br /> FUELSTORAGETANK MW 2R0 I •1 I <br /> COMPLEX(INSTALLED 1984) <br /> i <br /> � FORMER PRODUCT <br /> 'ISLAND NOTE <br /> I <br /> 1 UNDERGROUND STORAGE TANKS LOCATED <br /> i <br /> EAST HARDING WAY DURING FIELD WORK 11188 and 12/93 <br /> 2 UNDERGROUND STORAGE TANKS ON HISTORIC <br /> FACILITY PLANS <br /> FORMER CHEVRON U S A SERVICE STATION 9-1918 FIGUR: <br /> PACIFIC SCALE 45 East Harding Way at EI Dorado Avenue 4 <br /> ENVIRONMENTAL Stockton,Caiitomla <br /> PROJEC <br /> GROUP, INC 0 30 Bo FEET <br /> SITE MAP BEFORE SVE SYSTEM OPERATION(NOVEMBER 1990 NOVEMBER 1992) 320-133-133 <br /> , <br /> II <br /> I - <br />