Laserfiche WebLink
t v v <br /> LA ^� +(-3785) <br /> MW-13 N <br /> 0 <br /> ASPHALT <br /> CONCRETE <br /> EXISTING -3678 �� <br /> BUILDING mW-10 <br /> MW-11 MW-1 Z <br /> Mw-8 <br /> -37 80) (-37 88) <br /> 71 <br /> TTAA <br /> 1 <br /> z <br /> BSKD NEq <br /> o MW-3 <br /> USED,OIL <br /> z TANKI I (--37 47) OV-4 n n <br /> I MW-9 i, if MW-4 I I+-6 M+13 <br /> LEGEND 1 1 �V-5 (-37 74) 4 <br /> w L- - - A A <br /> MONITORING WELL v-I' IT <br /> 47 <br /> VAPOR EXTRACTION WELL I I MW-5+ <br /> �AV 1 TREATMENT <br /> VAPOR EXTRACTION WELL GASOLINE UNDERGROUND� V q <br /> COMPOUND •] <br /> POTENTIOMETRIC SURFACE TANK AREA V-2 0 MW-2R <br /> ( } SURFACE ELEVATION (FT ) C-,�-38 05)• 4- <br /> (DATUM MEAN SEA LEVEL) MW-2 <br /> (NM) NOT MONITORED <br /> ` WELL DRY IN PAST <1 FT WATER IN <br /> WELL, NOT USED FOR CONTOURING <br /> POTENTIOMETRIC SURFACE CONTOUR HARDINC WAY <br /> INTERVAL = 0 1 FT <br /> 0 003 FT/Fr ESTIMATED GROUNDWATER FLOW <br /> DIRECTION AND APPROXIMATE GRADIENT NOTE ALL STRUCTURES AND UNDERGROUND <br /> TANKS HAVE BEEN REMOVED <br /> CLIENT <br /> BTTECHNOLOGY <br /> 0 FEET 40 CHEVRON USA PRODUCTS CO POTENTIOMETRIC SURFACE MAP <br /> GROUNDWATER `—" CAL FORMER SS NO 9-1918 <br /> LOCATION JANUARY 26, 1994 <br /> FILE PROJECT NO 45 EAST HARDiNG WAY PM PE/RG FIGURE <br /> 4895PSM 02070-4895 STOCKTON, CALIFORNIA <br /> REV IDES IDET DATE 3 <br /> BB EFK 2/23/94 <br />