Laserfiche WebLink
F� e, <br /> GrouadwaLer Technola=� �2S=T FORMgy, Iac - sa�amento, California <br /> Project: :20704239..00 'Technivian- <br /> Site_ CHV/.Stockton,,4B ~E_�33ardin Scheduled:.=Jt "3yigr; 'Bruce 2ppler s" H Site,Mg 9- .1938* /28 '93 <br /> PREPARATORY CO20UNTS <br /> Vehicle Mileage - Start r1yS'Z2 Fina.sh 7 <br /> Visit Date-27brrival Time �j,��� Departure Time : �U U <br /> Called Project Manager" YES, ND. Time Who- <br /> If You Did Not Call, Why Not? <br /> Are You In Possession of a Site Safety Plane 40 NO <br /> GROMMWATER SAMPLING - Task Nr: 0610 [Quarterly] <br /> TAKE REQUIRED SAMPLES PER WORK ORDER DECON I P AND BAILER <br /> BEFORE EACH WELL. CHECK FOR REQUIRED RECHARGE <br /> * This fob is to be done on the same day and during the same <br /> mobilization as CHV - Airport Way <br /> * Bring cones for diverting traffic away From wells MW-12 and MW-13 when <br /> you are monitoring & sampling <br /> * Meet the regulator (Mary Maeys) on site for M&S inpection Call 72 <br /> hrs in advance to set up time, Phi (209) 468-0337 . <br /> * Monitor all wells to top of casing Note missing or destroyed wells <br /> * Purge each well of c well volumes or until dry Record p�', temp, and <br /> conductivity data <br /> * Remonitor each well to verafy Boo recharge . <br /> * Sample all wells without SP for ETEX/TPH-G (EPA Method 5030/8020/8015) . <br /> * Monitoring and sampling order)l, 7, 8, 2j� 12, 13 , 10, 9, 5 , <br /> 11, 4 <br /> * <br /> Note All wells have been dry in the past, exccept for 9, 10 , 11, 12 , <br /> 13 Check for water anyway <br /> * Collect rinsate and travel planks Have lab run one of each for <br /> BTEX/TPH-G only. <br /> * Check wells for working locks and cans <br /> -v <br /> Page 1 RECEIVED <br /> i <br /> JAN 1 1994 <br />