My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> (aSteven <br /> Valley Region <br /> Winston H.Hickoz Steven T.Butler,Acting Chair Gray Davis <br /> Govemor <br /> Sec,etaryfor Sacramento Main Office <br /> Environmental 1ntemet Address: http,/A w.sw !,=.govt— gcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,Califomia 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> Ms.Leah Goldberg 2 April 1999 <br /> Hanson-Brideett <br /> 333 Market Street, 23rd floor <br /> San Francisco, CA 94105-2173 <br /> REVISED SCHEDULE,KOPPEL STOCKTON TERMINAL,SAN JOAQUINCOUNTY <br /> In October 1998, staff provided conditional approval of a work plan to install monitoring wells to fully define the <br /> plume resulting from activities at the Koppel Stockton Terminal. Since that time,you have been working to <br /> obtain access agreements with the two parties upon whose land the monitoring wells will be placed. I understand <br /> that you have recently finalized these access agreements and are now able to proceed with the field work. I <br /> appreciate all of your hard work in obtaining these agreements. <br /> Due to the delays in obtaining access,the schedule agreed to in my 9 September 1998 letter is out of date and <br /> must be revised. Your consultant has informed me that he expects to begin field work by the end of April; <br /> therefore, please submit a well installation report by 30 May 1999. The new wells should be sampled for the <br /> first time as part of the site-wide second quarter sampling event and the results from all wells should be <br /> presented in the 30 July 1999 second quarter monitoring report. Quarterly monitoring would then continue for <br /> all wells as described in Monitoring and Reporting Program No. 97-805. Once the new wells have been sampled <br /> for two quarters,the parties should meet(probably in early December 1999)to discuss remedial alternatives, <br /> and a feasibility study for the selected alternatives(s)would be submitted by 15 February 2000. <br /> As you know, I have received a promotion and will no longer be working on this site. We are in the process of <br /> hiring a new staff person who should be on-board by early May and will be reached at(916)255-3080. If you <br /> have any questions in the meantime, please contact Wendy Cohen at(916)255-3075. <br /> WENDY WYELS, Chief <br /> Waste Discharge to Land Unit <br /> cc: Mr. Mike Infurna, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Daniel Munzer,Munco Inc.,Long Beach <br /> Ms.Karen Baril,Cargill Inc.,Minneapolis,Minnesota <br /> Ms_Manan Barbonio,Chevron Chemical Company, San Ramon <br /> Mr. Sheldon Nelson, Chevron Research and Technology,Richmond <br /> Mr.Brian Roberts, Chevron Corporation, San Francisco <br /> Mr. Steve Larson,Cargill,Minneapolis,Minnesota <br /> Mr.Anthony Ciasulli,Morgan,Lewis &Brockis,Los Angeles <br /> Mr. Gerald Vogt;CH2M Hill,Redding PD j 1 <br /> Mr.Ken Laconde, SCS Engineers,Long BeachAPR - 71999 U <br /> Mr.Barry Nicholson,Port of Stockton, Stockton <br /> C e2M HILL <br /> REDDiNG <br /> California Environmental Protection Agency <br /> ea <br /> RecycledPaper <br />
The URL can be used to link to this page
Your browser does not support the video tag.