My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
3500 - Local Oversight Program
>
PR0545272
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:00:03 PM
Creation date
1/31/2020 4:30:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545272
PE
3528
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
02
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lC <br /> c' <br /> Csituations we carry backups for the dedicated units in the field. <br /> rDuring the purging of the well the sample integrity is always considered. We attempt to purge the <br /> 1� well without stressing the subsurface static conditions. As each well casing volume is removed the <br /> pH,temperature,conductivity,turbidity and odor is monitored.A laboratory grade Y.S.I.556 muli- <br /> probed meter is used by Del-Tech to insure the highest level of field monitoring of the parameters <br /> C described. If requested dissolved oxygen and oxidation redox potential will be also included At a <br /> minimum three well casing volumes will be attempted to be removed If at this time the well <br /> stabilization has not occurred then additional well volumes will be purged until a variance of less <br /> than 101/e is indicated or a N.T.U.turbidity reading of less than 15 is recorded(if possible). <br /> All purge water is discharge and contained in 60 gallon polyethylene drums. Each ofthese drums are <br /> sealed and labeled at the end of the monitoring event. They are then dollied to the most logical <br /> storage location on site,as to not cause a traffic hazard. Dnmm counts are completed each time the <br /> site is sampled and the inventory is recorded on the first page ofthe Del-Tech field monitoring log. <br /> L Next, the well is re-sounded to assure that a minimum of 80%water column recharge has been <br /> achieved. <br /> Once well stabilization has occurred,the well is sampled through the dedicated discharge tubing on <br /> dedicated well heads or with a clean stainless steel or disposable PVC bailer. The bailer is lowered <br /> into the well slowly as to not disturb the water within the casing. The bailer is lowered on a stainless <br /> steel cord that is wound onto a poly reel. Then the poly reel is spooled back up and the sample is <br /> decanted slowly as to not oxygenate or volatilize any possible constituents within the sample media <br /> Only containers with the appropriate preservatives are used to collect these samples. All sample <br /> containers are provided by a state certified laboratory pre-preserved. <br /> C' Immediately after sampling all of the samples collected are labeled and logged into a Chain-of- <br /> Custody. The samples are then placed into a ice chest with a mixture of blue ice and ice(frozen <br /> water.) The well head is now sealed up,decontamination of all downhole sampling equipment is <br /> completed with a field portable decontamination trailer. Each piece is thoroughly cleaned and <br /> returned to a clean container for storage. We then move on to the next sampling point or monitoring <br /> well and repeat the procedure. <br /> CExample of preprinted labels used by Del-Tech on a routine basis: <br /> CLIBIrr: YOUR CGTPANY NME / CONTACT (503) 555-1212 <br /> t'7 SITE: YOUR SITE NAM / ADDRESS � <br /> PRSSSRVATIVES: HCL <br /> U TION: MN-- <br /> COLLECTED BY: DEL-TECH 847-e757 <br /> Any additional site specific quality control or quality assurance measures required during the <br /> monitoring event will be adhered to as requested and required <br /> ( <br /> Del-Tech Geotechnical Support <br /> Standard Operating Procedures.t Groundwater Monitoring 2006 <br /> 1 <br /> y <br /> s <br /> C ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.