My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
3500 - Local Oversight Program
>
PR0545272
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:49:36 PM
Creation date
1/31/2020 4:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545272
PE
3528
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
02
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - _ -_ <br /> - _ 7 <br /> 17 - <br /> - _ .-- <br /> Will be placed2to3feet above the sand and the remainderof the well annulus wl:be <br /> filled with cement;.Each <br /> _ <br /> well-will-have aff r - <br /> t a is box with locking cap and lock <br /> _At least 48 hours after the wel11- r4,e constructed, the depth to water will be measured - <br /> andAhe wells will be developed.by removing groundwater until the return waterisfree,of - <br /> --sediment.After the development;:the water will continue to be removed until the pH,=; <br /> conductivity-and temperature;stabilize at which'time a water sample`will be taken and <br /> sent to the laboratory for diesel analyses The.top of-the casing will.be surveyed to -_ <br /> elevation. -- _ -- <br /> LABORATORY ANALYSES - -- - <br /> - - - - — - <br /> nj - <br /> The1anks at or near this site contain only diesel,-then46o a the:soil and water samples` - <br /> wdl be tested as follows:, <br /> SOIL - Method Detection limits = I. <br /> -- :EPA 8015 Diesel 5mg/K 9 <br /> . - <br /> - - - <br /> . Water <br /> EPA 8015 Diesel'. 50 ug/L-' <br /> _ -REPORT- <br /> When all the data:is received a report of the findings will be prepared showing the <br /> Tgeologic and laboratory results.-- Based upon the results, further recdinmendations will <br /> besuggested; if required <br /> _r PERMITS <br /> - s - <br /> _ We will obtain-from the Environmental Health DepartmentSan Joaquin County a drilling <br /> permit.--US Alert will be notified=at'least 72 hours-prior to the start of drilling.: If = <br /> underground utilities-are in conflict with a boring location, the well will be moved tothe <br /> nearest location ofthe original site: .., -- <br /> Once this:work.plan is approved by the Environmental Health DepartmentSan Joaquin, <br /> County,the following schedule will'be followed:-- _ <br /> Obtain Drilling P.erinrt _=_ "'3 weeks <br /> _ v - g <br /> Schedule Dnlhng_ - <br /> - <br /> - Drilling Wells and Installation_ _ ` 1 week- <br /> Develop'Wells and Survey 5 weeks = , <br /> _ _ <br /> Laboratory Analyses and PrepareReport _ 5 weeks _ -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.