Laserfiche WebLink
Ramos Oil-Proposal Phase 2 Beneto Oil French Camp Cardlock Facility <br /> December 14,2004 <br /> Page 2 <br /> i <br /> • Upon completion, each boring will be backfilled with neat cement grout in accordance <br /> with SJCEHD requirements. <br /> • No drilling wastes will be generated as a result of the direct-push technology. <br /> TASK 2 Laboratory Analysis of Soil and Groundwater Samples <br />! • One soil sample and one groundwater sample will be submitted for laboratory analyses of <br /> total petroleum hydrocarbons(TPH)as diesel using EPA Method 8015 Modified. <br /> Task 3 Results Reportine <br /> • Results of the investigation will be submitted Ramos Oil and North State Environmental in <br /> a short (1 to 2 page) letter report transmitting the boring logs, site sketch and laboratory <br /> analytical results. The report will summarize MBEG's field procedures, laboratory results, <br /> findings, interpretations ,and recommendations. Copies of the report will ONLY be <br /> supplied to North State Environmental and Ramos Oil, unless other requested by Ramos <br /> Oil. <br /> If you have any questions regarding this,please contact me at(916)613-0168. <br /> Sincerely, <br /> MBE L��^� NT EOLOGY <br /> Mic el A.Benin o ,R.G. <br /> California Registered Geologist No. 7124 <br /> cc: Ms.Chris Brown,North State Environmental <br /> Enclosures <br /> t <br /> s <br /> i <br />