Laserfiche WebLink
SIERRA LUMBER MW-1(screened 20 to 40-feet) <br /> Plot of TPH-g and Ground Water Depth vs Time <br /> 70,000 <br /> 33 <br /> A , <br /> 31 <br /> 60,000 -- <br /> 29 <br /> 0,000 <br /> e <br /> 4 <br /> Y <br /> A <br /> 50.E 0 27 <br /> x, <br /> x a <br /> * �` a . "� �• � 25 t <br /> M <br /> s m <br /> 40,000- <br /> C4 <br /> 0,000 Q <br /> V 16 <br /> v v 23 3 <br /> c <br /> k <br /> xe <br /> 7 <br /> 30,000 <br /> � 21 <br /> 19 <br /> 20,000 <br /> 17 <br /> 10,000 1 S <br /> Oct-94 Dec-95 Mar-96 Jun-96 Sep-96 Jan-97 Apr-97 Jun-98 <br /> TPH-9(ppb) <br /> Date <br /> Groundwater <br /> de feet <br />