My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003583
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
ARCHIVED REPORTS_XR0003583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:07:42 AM
Creation date
2/3/2020 9:26:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003583
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N) <br /> 15 November 2005 <br /> AGE-NC Project No 04-1239 <br /> Page 5 of 5 <br /> 3 3 WELL DEVELOPMENT <br /> Development of the proposed wells will consist of a combination of bailing with a stainless steel <br /> bailer to remove the major portion of fine-grained sediment from inside the well, surging to flush <br /> out or draw in sediment from the filter pack,and additional ground water evacuation with a Waterra <br /> inertia pump to finish the removal of fine-grained sediment Developmental purging activities will <br /> be continued until field parameters(pH,electrical conductivity,and temperature)have stabilized and <br /> purged water is visually sediment-free <br /> 3 4 GROUNDWATER SAMPLING PROCEDURES <br /> Ground water sample collection will be performed as described in the AGE-prepared Preliminary <br /> Site Investigation Work Plan, dated 27 December 2004 <br /> 3 5 EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> . All sampling tools will be thoroughly rinsed with clean water after being washed with a solution of <br /> Alconox All down-hole drilling equipment will be pressure washed prior to starting each boring <br /> Cuttings and rinseate generated during drilling and ground water sampling activities will be <br /> containerized in properly labeled,Department of Transportation(DOT)-approved 55-gallon drums <br /> and stored on-site in an area lacking public access Disposal alternatives will be evaluated based on <br /> the results of soil analysis <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.