Laserfiche WebLink
' Monitoring Well Installation and Quarterly Monitoring Report <br /> SIERRA LUMBER MANUFACTURERS (Case#2) <br /> 1 375 West Hazelton Avenue, Stockton, California <br /> TABLE OF CONTENTS <br /> 1 <br /> FIGURES W <br />' <br /> Figure 1 -Location Map <br /> P <br />' Figure 2 -Site Plan <br /> Figure 3 - Geologic Cross-Section A A ' <br /> Figure 4 - Geologic Cross-Section B-B' <br />' Figure 5 - Cross-Section A-A ' Adsorbed TPH-g <br /> Figure 6 - Cross-Section B-B' Adsorbed TPH-g <br /> Figure 7 - Ground Water Elevation <br /> TABLES <br /> 1 Table 1 - Ground Water Elevation Data <br /> Table 2 -Analytical Results of Soil Samples <br />' • Table 3 -Analytical Results of Ground Water Samples <br />' APPENDICES <br /> Appendix A -Site Background Information <br /> Appendix B -Boring Logs <br /> Appendix C -Monitoring Well Development Field Logs <br /> Appendix D - Quarterly Monitoring Event Field Logs <br />' Appendix E -Baumbach &Piazza Surveying Report <br /> Appendix F - CTEL Analytical Report- Monitoring Well Installation Soil Samples <br />' Appendix G - CTEL Analytical Report- Quarterly Monitoring Ground Water Samples <br /> I , <br /> I <br /> Advanced GcoEnvironmental,Inc <br /> I <br />