Laserfiche WebLink
i <br /> 2.3.1 Shallow Monitoring Well Construction <br /> The shallow monitoring well will be ilnstalibd in an 8-inch diameter soil boring drilled by a truck- <br /> . i,,; <br /> mounted drill rig, equipped with hollow,st�em augers. .The shallow well will be constructed with <br /> �1" Ii .! 4 <br /> 20 feet of two-inch diameter, Schedule 40, flush-threaded and machine-slotted (0.020-inch) <br /> polyvinyl chloride (PVC)well screenli: Given that the groundwater table is approximately 40 feet <br /> a`d u1 41 oil <br /> bgs, the well screen will span from approximately 30 to 50 feet bgs. Blank PVC casing will <br /> y , , .' s. <br /> thread into the top of the well screensir`a1ndlextend to the surface. <br /> �.. A filter pack of Monterey#3 graded.andwashed sand will be placed through the hollow stem <br /> { <br /> TI!ij! I "!€i <br /> 111 augers as they are slowly retrieved nd.until the sand pack reaches approximately two feet <br /> i -41 <br /> above the top of the screened inte"ri al: Overlying the sand pack, two feet of bentonite chips will <br /> be placed and hydrated within the annular space between the borehole and the well casing. <br /> Over the hydrated bentonite, a surface seal of neat cement grout will be installed with a tremie <br /> i; 1 <br /> pipe. The top of the well will be'secured with a water-tight locking cap and an above-grade <br /> stave pipe monument. <br /> ' <br /> 2.3.2 Deep Monitoring Well Construction <br /> The deep monitoring well will be installed to investigate the first deeper groundwater-bearing <br /> d <br /> zone below the9 roundwater table:�:The'depth and construction of the proposed deep well will be <br /> based on the soil stratigraphy obtained from the proposed co-located CPT boring. <br /> a located outside of the plume of impacted roundwater, a <br /> Since the deep well w€II presumably,be p p g , <br /> ., <br /> conductor casing will not be used to seal'off the overlying groundwater during drilling. The deep <br /> monitoring well will also be installed m,an 8-inch diameter soil boring drilled with hollow-stem <br /> augers. <br /> To evaluate and monitor the extent of impacted groundwater detected at MW-5, the deep well <br /> should be constructed similar to MW-5. Currently, the groundwater table is approximately 17 <br /> LI feet above the top of the MW-5'weilscreen. Monitoring well MW-5 was installed in May 1994 to <br /> 1a'i`. <br /> a total depth of 75 feet and a screen'mterval spanning from 55 to 75 feet bgs. As such, unless <br /> field observations dictate otherwise;the proposed deep well will consist of 20 feet of two-inch <br /> diameter, Schedule 40, flush-threaded and machine-slotted (0.020-inch) PVC well screen from i <br /> approximately 55 to 75 feet bgs. Blank.PVC casing will thread into the top of the well screen <br /> } and extend to the surface. <br /> . i <br /> 8 <br />