Laserfiche WebLink
Based on these conclusions, Ramage Environmental recommends that the monitoring well network <br /> continue to be monitored and sampled on a quarterly basis to further monitor plume concentration <br /> and stability Additional efforts should be made to locate the two monitoring wells covered in dirt <br /> (MW-4 and VW-1) Monitoring well MW-1 should be abandoned The next quarterly groundwater <br /> ' monitoring event is scheduled for February 2003 <br /> In addition, Ramage Environmental recommends that a work plan be developed to actively reduce <br /> the concentrations of MTBE in groundwater Given the relatively low concentration of MTBE and <br /> lack of TPH-as-gasoline and BTEX, remedial methods such as ozone and/or air sparging should be <br /> 1 considered <br /> 1 <br /> 10 g <br /> 1 <br />