My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002799
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:47:03 PM
Creation date
2/3/2020 10:23:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002799
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> RESNA Industries Inc <br /> Quality Assurance/Quahty Control Plan <br /> Revised November 1992 <br /> ' Provided the database is of sufficient size, statistical techniques may be employed for data <br /> ' validation. <br /> ' 9.0 GROUNDWATER MONITORING PROTOCOL <br /> Monitoring of depth to water and free product thickness within wells at the site will be <br /> conducted using an Interface Probe or Conductivity Meter. For consistency, all measurements <br /> will be taken from the north side of the wellhead at the survey mark. To assess Potential <br /> infiltration of fine-grained sediments, total well depth will also be sounded. <br /> Product thickness is calculated by subtracting the depth to product from the depth to water. In <br /> addition, water elevations are adjusted for the presence of fuel with the following calculation: <br /> (Product Thickness) (.8) + (Water Elevation) = Corrected Water Elevation <br /> NOTE: The factor of 0.8 accounts for the density difference between water and petroleum <br /> hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 hours after development prior to free <br /> product inspection. <br /> An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br /> sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br /> sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br /> 1 <br /> QAQC1092 FNL 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.