My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002813
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:45:24 PM
Creation date
2/3/2020 10:29:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002813
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAMAGE <br /> ENVIRONMENTAL �� �� �,��� Sacramento Office <br /> 14670 Cantova Way, Suite 200 <br /> 22 Rancho Muneta, CA 95683 <br /> Tel (916) 354-3250 <br /> May 20, 1998 Fax (916) 354-3251 <br /> Mr Harlin Knoll, Sr R E H S <br /> San Joaquin County PHS/EHD <br /> 304 East Weber Avenue, 3rd Floor <br /> Stockton, CA 95201-0388 <br /> Re Transmittal-Problem Assessment Report and Corrective Action Plan <br /> San Joaquin Catholic Cemetery, Stockton, California <br /> USTCF Claim #1092 <br /> Dear Mr Knoll <br /> On behalf of the San Joaquin Catholic Cemetery, Ramage Environmental is pleased to <br /> provide the San Joaquin County Public Health Services Environmental Health Division <br /> (PHS/EHD)with the enclosed Problem Assessment Report (PAR) and Corrective Action <br /> Plan (CAP) for the above-referenced project <br /> . Approval of this CAP is required from PHS/EHD,prior to completing the engineering design <br /> and system permitting The approved PAR and CAP and the design plans will be used as <br /> part of a bid package for the solicitation of at least 3 bids to construct, operate and maintain a <br /> vapor extraction system at the site The bids will be submitted to the UST Cleanup Fund for <br /> cost pre-approval <br /> Thank you for your review and approval of the enclosed PAR and CAP and for your overall <br /> assistance on this project If you have questions or need any additional information,please <br /> call me at (916) 354-3250 <br /> Sincerely, <br /> RAMAGE ENVIRONMENTAL <br /> e-�� -V"A&-�� I <br /> Joseph Ramage, R G <br /> Project Manager <br /> Enclosure <br /> • CC Mr Al Vigil-San Joaquin Catholic Cemetery <br /> Ms Elizabeth Thayer-RWQCB, Central Valley Region <br /> Ms Teresa Trinh, WRCE, UST Cleanup Fund <br />
The URL can be used to link to this page
Your browser does not support the video tag.