My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002814
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
719
>
3500 - Local Oversight Program
>
PR0545262
>
ARCHIVED REPORTS_XR0002814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:46:31 PM
Creation date
2/3/2020 10:29:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002814
RECORD_ID
PR0545262
PE
3528
FACILITY_ID
FA0009940
FACILITY_NAME
SAN JOAQUIN CATHOLIC CEMETERY
STREET_NUMBER
719
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12720002
CURRENT_STATUS
02
SITE_LOCATION
719 E HARDING WAY
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAMAGE ENVIRONMENTAL <br /> ' Site Health and Safety Plan <br /> ' I. GENERAL INFORMATION <br /> i <br /> Date: March 12, 1998 <br /> iProject Name: San Joaquin Catholic Cemetery <br /> Protect Site Location: Harding Way and Cemetery Lane, Stockton, California <br /> Client Contact: Al Vigil Phone: (209) 466-6202 <br /> Project Manager: Joseph Rama e - Date 3 117- 19 <br /> J g � � <br /> The Project Manager is responsible for all onsite activities, including having all appropriate plans <br /> prepared and distributing the plans to field personnel and to authorized representatives of each <br /> subcontractor employed to perform work on site The Project Manager is also responsible for <br /> ensuring that the provisions of the Health and Safety Plan(HSP) are carried out This includes <br /> ensuring that all field personnel have received adequate training,that an adequate supply of <br /> safety and emergency equipment is available <br /> Designated Site Safety Officers: Joseph Ramage Date 3 fill -98 <br /> The Site Safety Officer(SSO) is responsible for implementing the site health and safety plan <br /> This includes ensuring that field personnel have read and signed the HSP, and that a Tailgate <br /> Safety Meeting is conducted on site each day prior to initiating field activities in addition, the <br /> SSO will be responsible for auditing the site operations for compliance with the health and safety <br /> plan and any applicable federal, state or local requirements The SSO is required to be on site at <br /> 1 all tames In the SSO's absence, a designated alternate will assume the duties and <br /> responsibilities <br /> 1 Work Objectives/Scope: Drill two soil borings and install two groundwater monitoring <br /> wells at the margin of a plume of groundwater impacted by dissolved concentrations of gasoline <br /> The newly installed wells will be developed and then sampled on a quarterly basis for at least <br /> one year <br />
The URL can be used to link to this page
Your browser does not support the video tag.