Laserfiche WebLink
Physical Hazards: These hazards are primarily associated with onsite equipment and the <br /> general nature of construction work Please refer to the attached Physical Hazard Analysis <br /> Sheets for controls <br /> X Heat X Slip, Trip, Fall X Excavations/Trenches <br /> Cold X Noise X Moving Equipment <br /> Rain X 1 Underground Hazards Traffic <br /> Fog Overhead Hazards Other <br /> ' Level of Protection: ❑ A ❑ B ❑ C ■ D <br /> Modifications: Modifications to levels of protection shall be made by the SSO based on <br /> air monitoring results <br /> Site Entry Procedures: The site will be entered from Cemetery Lane <br /> Site Control Measures: Unauthorized personnel will not be allowed in the work area No <br /> eating, drinking or smoking in the work area The Field Supervisor shall enforce these measures <br /> �1 and buddy system, PPE and training requirements for all on site personnel Spills are not <br /> expected to be a concern on the project However, if a spill is to occur, adsorbent materials are <br /> available <br /> A tailgate safety meeting will be held by the SSO for all site personnel The safety discussion <br /> will include, in addition to other items in this Health and Safety PIan, the following issues <br /> 0 Site personnel will execute proper lifting techniques for heavy items The <br /> maximum weight to be lifted by any site personnel should not exceed 60 lbs <br /> • The drill rig shall be inspected prior to operation by the drill crew and SSO <br /> 0 An exclusion zone shall be secured around the work area <br /> • Fire extinguisher, first aid kit, eye wash, and hospital route map shall be staged for <br /> easy access during drilling activities <br /> ' • Onsite personnel shall contact the SSO with any Health and Safety issues <br /> Personal Decontamination Procedures: Wash hands and face prior to eating, drinking or <br /> smoking and before leaving the site Remove contaminated clothing as soon as possible <br /> 4 <br />