Laserfiche WebLink
MONITORING WELL LOG <br /> PROJECT NAME San Joaquin Catholic Cemetery LOG OF WELL: MW-7 <br /> SITE ADDRESS Harding Way&Cemetery Lane TOTAL DEPTH (ft) 60 <br /> Stockton, Califomia WELL DIAM In 2 <br /> DATE STARTED April 28, 1998 DRILLERICOMPANY Larry Dibble <br /> DATE COMPLETED April 28, 1998 V&W Dnlbn (C-57#720904 <br /> GEOLOGISVENGINEER Joseph Ramage, R G #5856 <br /> DRILLING METHOD Hollow-Stem Auger Ramage Environmental <br /> 1 <br /> O w <br /> mm m <br /> _ w DESCRIPTION 2 L <br /> co o = <br /> d m r) H <br /> CL U d <br /> W E 0 O Q in ❑ <br /> Co Co a U3 Z <br /> WELL COMPLETION Expansion Cap,Dolphin Lock <br /> Stove-pipe monument casing(5-foot) <br /> 0 0 <br /> 1 CH CLAY Lean to fat clay with some silt, 1 <br /> 2 brown,stiff, moist no petroleum odor 2 <br /> 3 3 <br /> 4 4 <br /> 5 5 <br /> 6 6 <br /> 7 7 <br /> 8 (grades more silt) 8 <br /> 9 9 <br /> 10 10 <br /> 11 11 <br /> 12 12 <br /> 13 13 <br /> 14 14 <br /> 15 0 16 - <br /> 16 CL SILTY CLAY Brown,stiff,moist,no petroleum odor 16 <br /> 17 17 <br /> 18 18 <br /> i 19 19 <br /> 20 20 <br /> 21 21 <br /> 22 22 <br /> 23 23 <br /> 24 24 <br /> 25 0 25 - <br /> 26 26 <br /> . 27 27 <br /> 28 28 <br /> 29 TOP OF WELL SCREEN 29 <br /> 30 30 <br /> Page 1 of 2 <br />