My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
1112
>
3500 - Local Oversight Program
>
PR0545263
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 11:37:52 AM
Creation date
2/3/2020 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545263
PE
3528
FACILITY_ID
FA0005108
FACILITY_NAME
EGGIMANS HYDRAULIC GARAGE
STREET_NUMBER
1112
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15102101
CURRENT_STATUS
02
SITE_LOCATION
1112 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM ORDER NO. R5-2009,0149 XXX <br /> EGGIMAN'S HYDRAULIC GARAGE <br /> SAN JOAQUIN COUNTY <br /> In addition to the above sampling and analyses, field sampling and analyses shall be <br /> conducted each time a monitoring well or injection well is sampled. The sampling and <br /> analyses of field parameters shall be as specified in Table 3. ' <br /> Table 3: Field Sampling Requirements <br /> Parameters Units Type of Sample <br /> Groundwater Elevation Feet, Mean Sea Level Measurement <br /> Oxidation-Reduction Potential Millivolts Grab <br /> Electrical Conductivity uhmos/cm Grab' <br /> Dissolved Oxygen mg/L Grab <br /> pH pH Units (to 0.1 units) Grab <br /> Field test instruments (such as those used to test pH and dissolved oxygen).may be <br /> used provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments-, <br /> 2. The instruments are calibratedprior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the <br /> recommended frequency; and <br />! 4. Field calibration reports are submitted as described in item (b) of the "Reporting" <br /> section of this MRP. <br /> DISCHARGE MONITORING <br /> The Discharger shall monitor daily the discharge of water and amendments that are <br /> injected into the groundwater according to the requirements specified in Table 4. Each, <br /> amendment addition shall be recorded individually, along with information regarding the <br /> time period over which the amendment was infected into the aquifer. <br /> Table 4: Discharge Monitoring Requirements <br /> Parameters Units Type of Sample <br /> Injected Volume Standard cubic feet per minute Meter/Gage <br /> ESTABLISHMENT OF BACKGROUND CONCENTRATION VALUES <br />
The URL can be used to link to this page
Your browser does not support the video tag.