My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:18:49 PM
Creation date
2/3/2020 11:05:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I YECORD OF MEETING <br />' LUIiT Site: 15600 S.Harlan Road,Joe's Truck Plaza <br /> Attended by: Margaret Lagorio,San Joaquin County EHD <br /> Jim Barton,RWQCB-CVR <br /> Gowri Ifowtha,P.E.,Stratus Environmental <br /> Sarah Salcedo,P.G., Stratus Environmental <br /> Location: RWQC13 Office,Sun Center Drive,Sacramento,CA <br /> Date/Time: August 2,2007- 10:00 AM to 11:30 AM <br /> Meeting Overview: <br /> ✓ Stratus provided a PowerPoint presentation and most recent quarterly figures to Group. <br /> ✓ S. Salcedo provided an overview of site property,geology,hydrogeology,and groundwater assessment. <br /> I <br /> ✓ Group discussed recent quarterly data for newly installed B and-C zone wells.. Agreed that additional quarters of <br /> monitoring are needed before decisions regarding additional assessment are made. <br /> Group agreed that survey of entire site is needed(new wells and site features are changing) <br /> G. Kowtha provided brief overview of pilot testing and remediation proposals over the past several years and <br /> explained Stratus had conducted a cost-evaluation of six remedial alternatives. <br /> Stratus presented monitored natural attenuation(MNA)as viable option,since MTBE is only COC and is now only <br /> about 200 ug/1 maximum. SJC/RWQC13 indicated that MNA was probably not viable and:suggested groundwater <br /> extraction. <br /> i <br /> Group discussed,in detail, groundwater extraction and treatment and agreed that this is likely the 'most viable option <br /> for the site. Stratus explained that City of Lathrop and City of Manteca have preliminarily agreed to take low(I to <br /> 5 gpm) of treated water, and that we can use the sewer capacity currently allotted to (but not yet used by) the new <br /> hotel. <br /> i <br /> J. Barton stated that Stratus should be able to get a NPDES under general order for petroleum hydrocarbons. He <br /> will check with NPDES group and get back to Stratus. J. Barton followed up with Stratus after the meeting and <br /> stated that a permit would take only about_1 month after submittal of complete application <br /> i <br /> Stratus explained with low-:flow groundwater extraction, there is a probability that plume will be split. <br /> Implementation of some combination of:remedial alternatives to address offsite portions of plume(ozone,oxygen) <br /> was discussed. <br /> Group also discussed low risk closure or risk-based closure. SJC/RWQCB stated that site-specific risk-based <br /> closure levels would not likely be allowed. SJC/RWQCB stated that no soil gas survey was needed now(but maybe <br /> for future closure). M. Lagorio requested Stratus review ESLs and indicated that she thinks current groundwater I <br /> conditions may pass ESLs. <br /> +� It was agreed: <br /> o Stratus will prepare and submit a Site Conceptual Model <br /> o Stratus will prepare and submit a Final Remediation Plan (which will include the feasibility study i <br /> evaluation results and cost-effectiveness evaluation) <br /> I <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.