Laserfiche WebLink
i <br /> U U <br /> the subject property. The levels of contamination identified in Avalon's Phase <br /> II report and monotering events suggests that the gradient is to the <br /> north/northeast. Borings will be placed on and offsite of the property. <br /> Emergency Response: No <br /> 5.0 PROJECT ORGANIZATION <br /> 5.1 Project Staffing/Chain of Command <br /> T Names (Phone #/Pager) <br /> Project Manager/FSS Trevor Santochi (714) 836-6632/(714)271- <br /> 7243 <br /> i <br /> Crew Size )yo <br /> Project Managers/FSS: 1 <br /> Equipment Operators: 2 <br /> Technicians: 11 <br /> Laborers: 0 <br /> 5.2 Organization and Responsibilities P <br /> Avalon will oversee all phases of the project. The following management <br /> structure will be instituted for the purpose of successfully and safely completing <br /> this project. <br /> Project Manager: <br /> The Project Manager will be responsible for implementing the project and <br /> obtaining necessary personnel or resources for the completion of the project. <br /> Specific duties will include: <br /> • Coordinating the activities of all subcontractors, to include informing <br /> them of the required Personal Protective Equipment (PPE) and ensuring <br /> their signature acknowledging this site Health and Safety Plan. <br /> • Selecting a Field Safety Supervisor(FSS) and field personnel for the work <br /> to be undertaken on site. <br /> 0 Ensuring that the tasks assigned are being completed as planned 'and on <br /> yWAvalon Environmental Consultants 9627-001-6 <br /> Kashmar Singh - Joes Truck Plaza <br /> January 9, 2001 3 Lathrop,California <br /> i <br />