My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 11:49:27 AM
Creation date
2/3/2020 11:08:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. I <br /> i <br /> pre-cleaned prior to use unless they have been factory sealed in plastic sleeves, and are <br /> opened immediately prior to use in the field. Bailers will be lowered into the well with <br /> new lengths of polypropylene rope or Teflon coated wire which is capable of being <br /> decontaminated. Care will be taken to gently lower the bailer into the water to minimize <br /> turbulence, aeration, or degassing of the well water. ! <br /> Sample containers will be held in a covered storage area until used, and only opened <br /> immediately prior to filling. Prior to sampling, sampling personnel will put on new, <br /> clean, latex, surgical gloves to avoid sample or container contamination. The water in <br /> the bailer will be slowly dispensed into the sample bottle(s) using a bottom emptying <br /> device on the bailer to minimize aeration of the water. All sample containers will be <br /> filled completely to the top of the bottle and.sealed with zero head space. The bottles <br /> will be immediately labeled, logged, placed in ziplock bags, and stored in a pre-cooled i <br /> ice chest pending delivery to the laboratory. <br /> When possible, wells shall be sampled in order from least to most contaminated. <br /> Samples from wells with observable floating product will not be analyzed for dissolved <br /> i <br /> phase constituents, however,the thickness of the floating product layer will be noted on j <br /> the purging and sampling log, if possible. A chain of custody form will be completed in <br /> the field and accompany all samples submitted to the laboratory. <br /> Sample Numbering. Unless otherwise specified in the work plan or drilling and <br /> sampling plan for this project,groundwater samples will be numbered with the well <br /> number followed by a'W' and a number designation (i.e. TV-1-W1, TV-]-W2, etc.). <br /> During sample collection, all samples will be labeled and properly packed for shipment. <br /> At a minimum,sample labels shall include ERG's job number,job name, sample number, <br /> date, initials of the person collecting the samples, and time collected. <br /> i <br /> i <br /> I <br /> Samples will be contained in sealed, clear,plastic zip-lock bags with all sample labels <br /> and identifiers easily visible. Samples will be packed and shipped in coolers pre-chilled <br /> to 4 degrees Centigrade. Temperature will be maintained using dry ice or conventional <br /> ice in double plastic bags. Adequate sample protection during shipment will be ensured <br /> by surrounding samples with vermiculite, foam pieces, foam rubber, or some comparable <br /> i <br /> packing material, as required for protection during shipment. j <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.