Laserfiche WebLink
1%00.1 %..� <br /> Groundwater Monitoring Report, Second Quarter 2006 (Secor). <br /> 2.2 Site Geology and Hydrogeology <br /> Soils underlying the Site consist of three laterally extensive fine-grained sand layers: <br /> Sand A, Sand B, and Sand C (Secor, 2006). Sand A is located 5 to 8 feet below <br /> ground surface(bgs)and is 3-to 10-thick. A clay layer has been encountered at <br /> approximately 10 to 15 feet bgs and is approximately two feet in thickness. Sand B is <br /> located between 25 to 35 feet bgs and is between 7-to 18-feet thick. Sand C is ? <br /> located between 50 and 65 feet bgs and is between 15-to 25-feet thick. Groundwater <br /> was observed in each of the three sand layers. The existing monitoring wells are <br /> screened across Sand A,except for monitoring wells MWO-1X and MW-8,which are <br /> screened across Sand B. <br /> Based on last quarter's groundwater sampling event depth to groundwater is <br /> approximately eight feet bgs. Groundwater flow is reported to be to the northeast with <br /> a gradient of 0.00075 feet per foot(ft/ft). <br /> A pump test conducted by Secor(June, 2006) used groundwater monitoring wells <br /> MW-2 and MWO-1X, which are screened across Sand A and Sand B,respectively. <br /> Similar amounts of measured drawdown were observed in both wells while pumping <br /> on the well in the other sand strata, suggesting hydraulic connectivity between Sand <br /> A and Sand B. It is not know if Sand C is connected hydraulically to Sand A and B. <br /> 3.0 SCOPE OF WORK <br /> The scope of work and objective for this proposed site assessment includes the following: <br /> ■ Install up to seven groundwater monitoring wells (MW-12 through MW-18) <br /> and located approximately as follows: <br /> o One groundwater monitoring well (MW-12)will be located in the planter <br /> alongside the eastern edge of South Harlan Road and directly west of <br /> existing groundwater monitoring well MWO-1, <br /> o One groundwater monitoring well (MW-13)will be located near the <br /> western edge of South Harlan Road and directly west of existing <br /> groundwater monitoring well MW-1, <br /> o One groundwater monitoring well (MW-14)will be located in Chandra <br /> Way and approximately 150 feet northeast of existing groundwater <br /> monitoring well MW-11, <br /> o One groundwater monitoring well (MW-15)will be located in the planter <br /> alongside the eastern edge of South Harlan Road and directly west of <br /> existing groundwater monitoring well MWO-3, <br /> o One groundwater monitoring well (MW-16)will be located adjacent to <br /> existing groundwater monitoring well MWO-1X, <br /> o If lab analysis of the grab groundwater sample collected early on from <br /> MW-12 indicates MTBE impact, then a groundwater monitoring well <br /> Environmental Remediation Group Page 2 Site Assessment Work Plan <br /> Project No.0406 Joe's Travel Plaza <br />