My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 11:49:27 AM
Creation date
2/3/2020 11:08:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3 depicts the proposed approximate location of the proposed groundwater monitoring <br /> wells. <br /> Soil samples will be collected in brass or stainless steel sleeves,labeled, stored in-a <br /> cooler with bagged ice,.and transported to a California-certified environmental laboratory <br /> under chain of custody protocol for analysis. The samples will be analyzed for total <br /> petroleum hydrocarbons as gasoline(TPHg)and diesel (TPHd)benzene, toluene; ethyl j <br /> benzene,xylene(BTEX),methyl-tertiary butyl ether(MTBE), and oxygenates using EPA <br /> Method 826013,and CAM 17 Metals. <br /> Prior to sampling,monitoring wells will be purged to remove stagnant casing water from <br /> the well that is not representative of aquifer conditions. Wells will be purged by <br /> removing the traditional three casing volumes prior to sampling. Groundwater samples <br /> will be analyzed for total petroleum hydrocarbons as gasoline(TPHg),benzene,toluene, <br /> ethyl benzene,xylene(13TEX),methyl-tertiary butyl ether(MTBE), and oxygenates <br /> using EPA Method 826013,Total Dissolved Solids (TDS), CAM 17 Metals, and a water <br /> quality analysis(redox potential, suspended solids,and total hardness). <br /> 5.1 Waste Management <br /> Any soil cuttings generated during drilling activities will be placed in DOT-approved <br /> drums and labeled appropriately. The soil and water will be stored onsite for disposal <br /> pending analytical results obtained from assessment activities. <br /> 6.0 REPORTING <br /> At the completion of site activities,and after the laboratory analytical data has been <br /> received, ERG will prepare a report describing the sampling procedures, laboratory <br /> analytical data,and test findings. The report will contain recommendations, as <br /> appropriate, for additional work that might be necessary. <br /> 7.0 REFERENCES <br /> Secor International Incorporated,Additional Site Assessment Report, Joe's Travel Plaza, <br /> June 27, 2006. <br /> Secor International Incorporated, Quarterly Groundwater Monitoring Report, Second <br /> Quarter 2006(April through June).foe's Travel Plaza, August 25, 2006 <br /> I <br /> i <br /> Environmental Remediation Group Page 4 Site Assessment Work Plan <br /> Project No.0406 Joe's Travel Plaza <br /> � 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.