Laserfiche WebLink
1 <br /> • IElevation of Gradient Direction Well Elevation of PVC Depth to Groundwater <br /> Groundwater <br /> r MW-2 3128/03 13 68 fent S 35 feet +533 East <br /> MW-3 2/12100 13 55 feet 6 34 feet +721 East <br /> MW-3 4/28/00 13 55 feet 6 44 feet +711 East/Northeast <br /> MW-3 9/20/00 13 55 feet 7 93 feet +562 Northeast <br /> r MW-3 12/27/00 13 55 feet 8 63 feet +492 North <br /> MW-3 7/30/01 13 55 feet 8 12 feet +543 East/Northeast <br /> MW-3 1115/01 13 55 feel 8 96 feet +459 East <br /> MW-3 2127/02 13 55 feet 7 56 feet +599 East <br /> r MW-3 5/21/02 13 55 feet 7 89 feet +566 East <br /> MW-3 8/29/02 13 55 feel 8 25 feet +530 East <br /> MW-3 12/10/02 13 55 feet 8 98 feet +457 East <br /> MW-3 3/28103 13 55 feet 8 25 feet +530 East <br /> I MW-4 2112/00 13 56 feet 6 41 feet +715 East <br /> MWA 4/28/00 13 56 feet 6 35 feet +721 East/Northeast <br /> MW4 9/20100 13 56 feel 7 87 feet +569 Northeast <br /> MW4 12/27/00 13 56 feet 8 61 feet +495 North <br /> I • MW4 7/30101 13 56 feet 8 09 feet +547 East/Northeast <br /> MW4 11/5101 13 56 feet 8 95 feet +461 East/Northeast <br /> MW-4 2/27102 13 56 feet 7 56 feet +600 East <br /> MWA 5121/02 13 56 feel 7 89 feet +567 East <br /> MW-4 8/29/02 13 56 feet 8 21 feet +535 East <br /> MW41 12/10/02 1 13 56 feet 8 97 feet +459 East <br /> MW-4 3128/03 13 56 feet 8 22 feet +534 East <br /> MW-5 2112100 14 00 feet 6 77 feel +723 East <br /> MW-5 4128/00 14 00 feet 6 78 feet +722 East/Northeast <br /> MW-5 9120/00 14 00 feet 8 29 feel +5 71 Northeast <br /> MW-5 12/27/00 14 00 feet 9 02 feet +498 North <br /> MW-5 7/30/01 14 00 feet 8 53 feet +547 East/Northeast <br /> I MW-5 11/5101 14 00 feet 9 40 feet +460 East <br /> MW-5 2/27/02 14 00 feel 7 99 feet +601 East <br /> MW-5 5/21/02 14 00 feet 8 31 feel +569 East <br /> MW-5 8129/02 14 00 feet 8 61 feel <br /> +539 East <br /> I <br /> Avalon Environmental Consultants Project#9627-001-14 <br /> Joes Truck Plaza 15600 South Harlan Road <br /> April 21, 2003 7 Lathrop, California <br /> I <br />