Laserfiche WebLink
1 <br /> Advanced <br /> GeoEnvironmental, Inc. <br /> 4005 North Wilson Way Stockton CA 95205 •(209)467-1006 •Fax(209)467-1118 —� <br /> Monitoring Well Field Log <br /> Well Data <br /> Project Name Gemelos Project No Date 11-18-98 <br /> I AGE-NC- <br /> Pre-Purge DTW —705 Time 12V Well I D MW- <br /> Post-Purge DTW +I, Time , 3 <br /> Total Depth of Well AL IBL"] Well Volume Casing Diameter 2" 4" 6" <br /> Gal IN 016 065 1 47 <br /> Sampler(s)M Rauser Sample Containers VOA's <br /> Sample I D MW-3 / 11-18-98 Analysis TPH-g, BTEX, MTBE <br /> Stabilization Data <br /> Volume Cond Color/ <br /> Time (gallons) pH Temp XyS/cm Turbidity Notes <br /> d 5 z <br /> I } 3 <br /> I <br /> l <br /> I <br /> IPurge Method 2 stage purge pump <br /> ISample Method Dispoable Bailer Well Integrity <br /> . Sample T me I r, Dissolved Oz --- <br /> I 1CM Hydac 1 Hydac2 //� - �J l512 <br /> 12 <br /> fa <br /> �Avon <br /> 3 JV"991REM <br />