My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003514
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
ARCHIVED REPORTS_XR0003514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:10:15 PM
Creation date
2/3/2020 12:00:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003514
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 WORK PLAN <br /> The objectives of the proposed scope of work are to <br />' • Further define the lateral extent of impacted soil and groundwater, <br /> • Test the feasibility of soil and groundwater remedial alternatives <br /> To achieve these objectives, Ramage Environmental proposes to <br /> • Install three additional groundwater monitoring wells, <br /> • Install one nested soil vapor extraction well, and one nested air sparge/soil vapor <br /> extraction well, <br /> • Conduct soil vapor extraction and air sparge feasibility tests <br /> 41 Project Planning and Permitting <br /> Prior to initiating fieldwork, a site-specific health and safety plan addendum will be prepared <br /> according to 29 CFR 1910 120 The health and safety plan will include safety procedures, <br /> chemical hazard information, site safety officers, and a medical emergency location <br /> To perform the drilling scope of work, a well permit will be obtained from EHD Since all of the <br /> work is to completed on-site, neither off-site access agreements nor encroachment permits will be <br /> required At least two working days prior to any field work, Ramage Environmental will notify EHD <br /> 1 so that inspections can be scheduled Underground Service Alert will also be notified so <br /> members can mark their underground utilities <br /> 42 Groundwater Monitoring Well Installations <br /> 1 To further investigate the distribution of impacted soil, define the lateral extent of impacted <br /> groundwater at the water table, delineate the stratigraphy of shallow subsurface soils, and expand <br /> the groundwater monitoring network at the site, three additional groundwater monitoring wells will <br /> be installed The proposed well locations will be approximately 70 feet west, 180 feet south, and <br /> 225 feet southeast of the former UST #3 (Figure 3) The proposed well to the west will be located <br />' for use as an observation well during the proposed remedial feasibility tests The other two <br /> proposed wells are positioned further from the source area to attempt to define the lateral extent <br /> of Impacted groundwater <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.