My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003518
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
ARCHIVED REPORTS_XR0003518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:12:36 PM
Creation date
2/3/2020 12:01:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003518
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY <br /> i ENVIRONMENTAL HEALTH DIVISION ` <br /> Karen Furst, M D , M PH , Health Officer � r <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 �Lj�oa� <br /> 2091468-3420 <br />' <br /> MS-KERRY WASSON <br /> COUNTY OF SAN JOAQUIN <br /> FACILITIES MANAGEMENT DIVISION <br />' 177 EAST SCOTTS AVE <br /> STOCKTON CA 95205 <br /> RE 1810 EAST HAZELTON AVE,STOCKTON Site Code # 1141 <br />' WORK PLAN Additional Site Assessment/Morutonng Well Installation and Groundwater Sampling <br /> DATED. July 16,2001 <br /> PREPARED BY, Ramage Environmental <br /> jW.PZPVED <br /> EDED 5uhmit <br />' ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H86 25299 37,subd(c)(3)] <br /> 1 Complete monitoring well installation with soil and groundwater sampling <br /> 2 Deternune groundwater flow direction and gradient <br />' 3 Define the vertical and lateral extent of soil and groundwater contarmnation <br /> 4 Complete and submit a more comprehensive well receptor survey <br /> 5 Continue with quarterly groundwater monitoring and sampling until the site is closed with no further action <br />' 6 Evaluate interum remedial measures and feasibility testing <br /> 7 Report findings with recommendations for additional monitoring well installation <br /> I <br /> Apply for an EHD permit to install the proposed well <br /> Obtain preapproval for all cost from the SWRCB Cleanup Fund <br /> The"Tri-Regional Board Staff Recommendations For Preliminary Evaluation and Investigation of Underground Tank <br /> Sites" along with its"Appendix A" and"Appendix B" should be used as guidance documents All work and reports <br /> which require geological or engineering evaluation must be performed under the direction of an appropriate Cahf omia <br /> registered or certified professional <br /> DD 'D 7/18/2001 BY Q1 <br /> Harlin Kn411.senior RENS (209)468-0337 <br /> cc Marty Hartzell <br /> Ramage Environmental A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.