Laserfiche WebLink
1 <br /> • During March 1999, Tait Environmental Management (Tait) supervised the removing of UST#4, <br /> tin-place abandoning of UST#8, and soil and/or groundwater sampling from two hand-auger soil <br /> borings (HA-1 and HA-2), two truck-drilled soil borings (B-3 and SB-3), and two groundwater <br />' monitoring wells (MW-1 and MW-2) The boring and well locations are shown on Figure 2, the <br /> soil sample analytical results are summarized in Table 1, the well construction and groundwater <br />' monitoring data are summarized in Table 2, and the groundwater analytical results are <br /> summarized in Table 3 Tait documented the project results in Site Assessment Report, dated <br /> May 11, 1999 <br />' On July 13, 2000, Tait completed a water well survey for the site vicinity Tait identified nine water <br />' wells within 2,000 feet of the site, including the municipal irrigation well at Stribley Park <br /> On March 16, 2001, Tait submitted a work plan to perform an additional site assessment The <br />' proposed scope of work included drilling nine additional on-site soil borings and installing three <br /> additional on-site monitoring wells On July 16, Ramage Environmental completed a review of <br />' Tait's work plan and submitted a letter work plan PHS/EHD approved the letter work plan on July <br /> 18, 2001 <br /> lie <br /> 1 <br /> 1 <br />' 6 <br /> 1 <br />