My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003521
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
ARCHIVED REPORTS_XR0003521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 7:10:22 PM
Creation date
2/3/2020 12:03:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003521
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• II. GENERAL INFORMATION- <br />�. 1 Obtain an EPA Site Number from the Department of Toxic Substances Control (800) 61 TOXIC for temporary <br /> hazardous waste removal activities associated with underground storage tank(UST) removals. <br />' 2 Disposal Information. Public Health Services Underground Storage Tank Disposition Tracking Record(UST <br /> Tracking Record, page 10) shall accompany each tank removed from site. Tank(s) will be issued an identification <br /> number which PHS-EHD's representative will note on the UST Tracking Record. Contractor will affix same <br />' identification number onto tank end using fluorescent spray paint Contaminated tanks and/or piping are to be <br /> transported under Hazardous Waste Manifest by a state registered hazardous waste hauler. <br /> 3 Contractor to Provide- Combustible/Flammable gas detector(to verify the bower Explosive Limit (LEL) <br />' atmosphere and oxygen level of tank prior to lifting from excavation), adequate mtmber(s)and appropriate type(s) <br /> of fire extuigmsher(s), barriers to secure the area as necessary to mynarm?traffic and pedestrian interference, and <br /> fluorescent spray paint to affix tank identification munbers. It shall be the project manager's responsibility for <br /> compliance with all health &safety regulations and requirements, which shall be strictly adhered to at all times <br /> during the course of the closure activities <br /> 4 The PHS-EHD permit shall be on site during tank excavation and removal <br />' 5. Any changes in this document shall be approved by PHS-EHD prior to initiating work. <br />' 6 Closure-in-Place: If Closure-in-Place is the suggested method of abandonment, complete form <br /> EH 23 039 and submit written approval from the local Fire Department. <br />' 7 Temporary Closure- If Temporary Closure is the suggested method of abandonment, complete <br /> and submit this form and a written approval from the local Fire Department. <br /> . S The following documentation shall be submitted within 30 days of the tank removal date: <br />' a) Analytical results, mailed directly from laboratory to PHS-EHD, including a chain of custody and quality <br /> assurance and quality control (QA& QC) <br />' b) UST Tracking Record Shect(s) and/or Tank Hazardous Waste Mamfest(s) <br />' c) Tank Closure Certification Form(DTSC form 1249) <br /> d) Hazardous Waste Manifests for piping, ruisate. residual fuel, or waste oil receipt <br /> C) Submit the backfiill excavation certificate as required by San Joaquin County and the incorporated City <br /> Budding Departments This report will be referred to the appropriate agency for their review <br />' A site which has had UST(s) removed, shall not be considered for final closure until the above items are <br /> submitted for review. <br />' III. SITE MITIGATION <br /> 1. In the event contamination is observed, confirmed or suspected as a result of a healing UST system It is the <br />' responsibility of the owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit pnor to Initiating <br /> any assessment or remediation activities. To minimize delays, a Corrective Action Plan may be submitted <br /> concurrent with tank closure or installation plans. Address one copy of the Corrective Action Plan to the Site <br /> Mitigation Unit for review For further assistance contact the Site Mitigation Unit at(209)468-3450 <br />' 23 046 (Revisedl0/19/98) Page 2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.