My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
FIELD DOCUMENTS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:41:42 PM
Creation date
2/3/2020 12:17:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Well Construction and Destruction Details <br /> Former 76(Former BP)Service Station No. 11195 <br /> 16500 Harlan Rd. Lathrop,CA <br /> Borehole Casing Screened Filter Pack Bentonite Seal Cement Seal <br /> Material (Inches) <br /> Well I.D. Construction TOC Elevation Boring Depth Diameter Diameter Casing Slot Size Interval Interval Interval Interval Location Well Destruction Methods <br /> Date (feet above msl) (feet bgs) (inches) (inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) <br /> Remediation Wells <br /> SP-1 12/09/02 NA 36.0 8 0.75 PVC NA NA 32-36 30-32 1-30 On Site Overdrill <br /> SP-2 12/09/02 NA 35.0 8 0.75 PVC NA NA 31-35 29-31 1-29 On Site Overdrill <br /> SP-3 12/09/02 NA 37.0 8 0.75 PVC NA NA 33-37 30-33 1-30 On Site Overdrill <br /> SP-4 12/09/02 NA 30.0 8 0.75 PVC NA NA 26-30 24-26 1-24 On Site Overdrill <br /> SP-5 12/10/02 NA 30.0 8 0.75 PVC NA NA 26-30 24-26 1-24 On Site Pressure Grout <br /> SP-6 12/12/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 2.5-26 On Site Overdrill <br /> SP-7 12/11/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 2-26 On Site Overdrill <br /> SP-8 12/11/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 1-26 On Site Overdrill <br /> SP-9 12/11/02 NA 32.0 8 0.75 PVC NA NA 2332 27-29 1.5-27 On Site Overdrill <br /> SP-10 12/11/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 1-26 On Site Pressure Grout <br /> SP-11 12/11/02 NA 33.0 8 0.75 PVC NA NA 29-33 27-29 1-27 On Site Pressure Grout <br /> SP-12 12/13/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 1.5-26 On Site Pressure Grout <br /> SP-13 12/12/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 1.5-26 On Site Overdrill <br /> SP-14 12/12/02 NA 32.0 8 0.75 PVC NA NA 28-32 26-28 1.5-26 On Site Pressure Grout <br /> SP-15 12/12102 NA 32.0 8 0.75 PVC NA NA 26.5-32 24-26.5 1.5-24 On Site Overdrill <br /> SP-16 06/26/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 1-19 Off Site Overdrill <br /> SP-17 06/26/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 1-19 Off Site Overdrill <br /> SP-18 06/26/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 1-19 Off Site Overdrill <br /> SP-19 06/25/08 NA 24.5 8 0.75 PVC NA NA 20.5-25 18.5-20.5 1-18.5 Off Site Overdrill <br /> SP-20 06126/08 NA 25.0 8 0.75 PVC NA NA 21-25 1321 1-19 Off Site Overdrill <br /> SP-21 06/26/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 1-19 Off Site Overdrill <br /> SP-22 06124/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 0-19 Off Site Overdrill <br /> SP-23 06/25/08 NA 25.5 8 0.75 PVC NA NA 21-25 19-21 1-19 Off Site Overdrill <br /> SP-24 06/25/08 NA 24.5 8 0.75 PVC NA NA 20.5-25 18.5-20.5 1-18.5 Off Site Overdrill <br /> SP-25 06/24/08 NA 30.0 8 0.75 PVC NA NA 21-25 19-21 0-19 Off Site Overdrill <br /> SP-26 06/24/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 0-19 Off Site Overdrill <br /> SP-27 06/25/08 NA 25.0 8 0.75 PVC NA NA 21-25 19-21 0-19 Off Site Overdrill <br /> Notes: <br /> TOC=top of casing Richland Crossroads <br /> msl=mean sea level Holiday Inn <br /> bgs=below ground surface Lathrop Business Park <br /> PVC=polyvinyl chloride On site-Phillips 66 <br /> NA=Not available Off site -Phillips 66 <br /> Elevations are in US survey feet,Vertical Datum is NGVD29 <br /> Well Construction and Destruction Details 2 of 2 ATC Project Number 52.75118.1751 <br />
The URL can be used to link to this page
Your browser does not support the video tag.