JUL 9 '98 16:59 FROM GETT' cR-RYAN INC TO 12094683433 PAGE .005/eio <br /> work Pias for wafer wall bxtroction-Toxo BP 76 Branded F=ility No. 11195 <br /> July 9. 1998 <br /> WATM WEM CONSTRUCTION <br /> The following construction details are based on observations and measurements coRected on site <br /> and during the samara survey. The water well is constructed with eight-inch inner-diameter steel <br /> casing which extends to approximately 94.5 feet below ground surface(bgs). The well extends <br /> to a tozal depth of approximately 99.5 feet bps. The bottom five feet of the well is un-casod opzn <br /> borehole. Static depth-to-groundwater was measured at approximately 8.5 feet bgs on June 5, <br /> 1998. PDI did not observe any obvious perforations or holes during their review of the camera <br /> survey video. Although the using ends at approximately 94.5 feet below grade, it is uncertain <br /> if the casing originally ended, or"landed", at that depth or whether it has deteriorated below that <br /> depth. However, PDI did observe a cavity at approximately 95.5 feet bgs which appears to <br /> represent an aquifer. Above this cavity, the borehole is circular and well defined, which may <br /> represent an overlying aquitard above the depth of 95.5 feet bgs. <br /> Based on discussions with PDI, it appears that the water well may be a driven well, installed using <br /> the cable tool drilling metbod. This method is commonly used in the Lathrop area to install water <br /> wells of this depth. The cable tool well driller would typically advance the boring and drive the <br /> well casing simultaneously until the desired depth was attained. The driller would often find a <br /> suitable water producing aquifer and terminate or'land" the using in a competent clay layer above <br /> the aquifer. <br /> SCOPE OF WOME <br /> GR, in conjunction with PDI, has developed the following scope of work for destruction of the <br /> water well. A letter from PDI outlining the proposed =pa of work is attached to this worts plan. <br /> The proposed scepa of work is designed to properly destroy the well without creating any <br /> opportunities for contaminant migration as a result of the well destruction process. GR proposes <br /> the following tasks: <br /> Tads 1: Groutkg3 of Ogarn Wed Boring <br /> GR is proposing to grout the open borehole portion of the water well with Portland <br /> cement. This step is dcsj Y to malas certain that the aquifer below the total depth of the <br /> well casing is scaled off from the well prior to casing perforation. The Portland cement <br /> grout will b2 pumped from thz bottom of the Nell to approximately 80 feet bgs by the use <br /> of a tremie pipe and grout pump. All groundwater expelled during the grouting opzration <br /> will be contained in DOT approved, 55-gallon drums, which will be stored on site pending <br /> proper disposal. <br /> 2 <br />