Laserfiche WebLink
GROUNDWATER SAMPLING FIELD NOTES <br /> f f Technician: <br /> Site: Project No.: �Ill e> S e5v 0 I Date-'Z 6 <br /> I OF <br /> Well no.:A2 Purge Method: <br /> Depth to Water(feet):_- Depth to Product(feet): <br /> Total Depth(feet):_ � —z-- LPH&Water Recovered (gallons): e3)rT <br /> Water Column(feet): '�. _ Casing Diameter(Inches): <br /> 80%Recharge Depth(feel): i 1 Well Volume(gallons): r <br /> Time. .' Time Depth: : Volume 0onduc T rriperature <br /> Start Stop. To.1f11ater:' Pu' ed tivi!j <br /> Y-': per. :7urbidity - -- :D. <br /> (feet);:._ (gallon's) :. jiSreriij: (F;C <br /> �31 16 <br /> S is at Time Sampled Total Gallons Purged Time Sampled <br /> :a Comments: <br /> Well No.f`+W�- / I Purge Method: ��_ i <br /> Depth to Water(feet): ! Depth to Product(feet):_ <br /> Total Depth(feet): -7 T-� LPH&Water Recovered (gallons):__ <br /> Water Column(feet):-- S�� Casing Diameter(Inches): <br /> 80%Recharge Depth(feet): t Well Volume(gallons): <br /> `Time. Tune Depth'':,:.> _ .Vofunie._:_;: `.:Cpnduc- ler Aeiature. <br /> Start Stop ToWater Purged tivity pH Turgidity t E.O:- <br /> (feet) (gallons) (uSlcm) - (F,,C) <br /> i <br /> Static at Time Sampled_ Total Gallons Purged, Time Sampled <br /> Comments: <br /> I.. <br />